File #: 20-9776    Version: 1 Name: Street Services contract with Cobb Fendley & Associates, Inc., in the amount of $49,095 as well as a 5% contingency of $2,455 for a total of $51,550 for Professional Engineering Services related to the repair and rehabilitation of the pedestrian bridge lo
Type: Agenda Item Status: Consent Agenda
File created: 2/5/2020 In control: Public Works
On agenda: 2/18/2020 Final action: 2/18/2020
Title: Street Services contract with Cobb Fendley & Associates, Inc., in the amount of $49,095, as well as a 5% contingency of $2,455, for a total of $51,550 for Professional Engineering Services related to the repair and rehabilitation of the pedestrian bridge located at Waggoner Park over Arbor Creek
Attachments: 1. AD10 PROF SVCS CONTRACT.pdf, 2. COBB FENDLEY EXHIBIT A PED BRIDGE.pdf, 3. 20-9776 CCC PED BRIDGE WAGGONER PARK.pdf

From

Glenda Peterson, Street Operations Supervisor

 

Title

Street Services contract with Cobb Fendley & Associates, Inc., in the amount of $49,095, as well as a 5% contingency of $2,455, for a total of $51,550 for Professional Engineering Services related to the repair and rehabilitation of the pedestrian bridge located at Waggoner Park over Arbor Creek

 

Presenter

Gabriel Johnson, Public Works Director

 

Recommended Action

Approve

 

Analysis

During a recent inspection at Waggoner Park, deficiencies were found at the pedestrian bridge crossing Arbor Creek. Further inspection revealed deficiencies to both sides of the bridge abutments as well as to the upstream concrete flume. It has been determined that stabilization of the existing concrete flume, bridge abutment slopes and the floor of the Arbor Creek channel is needed.

 

Cobb Fendley & Associates, Inc., will provide the Professional Engineering services for the design plans, specifications, estimates, and related documents for the pedestrian bridge rehab at Waggoner Park. (Cobb Fendley-Exhibit A).

 

Chapter 252, Section 22 of the Local Government Code allows for the exemption to competitive bidding when the expenditure is for Professional Services such as engineering services. Cobb Fendley & Associates, Inc. was selected as the most qualified professional due to their previous bridge design experience in Grand Prairie and knowledge of the problem at hand. 

 

 

Financial Consideration

Funding for this new engineering contract with Cobb Fendley & Associates, Inc., in the amount of $51,550 is available in the Parks Capital Projects Fund (317193), WO #02003503 (Waggoner Bridge Stabilization), 68450 (Engineering/Design).