Legislation Details

File #: 20-10003    Version: 1 Name: Ratification of an emergency purchase to North Texas Contracting, Inc. for the repair of a water leak on a 30 inch water main on the west side of Beltline Road on the north side of the Trinity River at Palace Parkway
Type: Agenda Item Status: Agenda Ready
File created: 5/19/2020 In control: Planning
On agenda: 7/1/2020 Final action:
Title: Ratification of an emergency purchase from North Texas Contracting, Inc. for the repair of a water leak on a 30 inch water main on the west side of Beltline Road on the north side of the Trinity River at Palace Parkway in the amount of $503,460, plus a 5% contingency of $25,173., for a total of $528,633
Attachments: 1. 20-10003 BACK UP DOCUMENTATION BELTLINE RD AT PALACE PKWY.pdf, 2. 20-10003 BELT LINE RD EMERGENCY REPAIR SUMMARY.pdf, 3. 20-10003 BELT LINE ROAD AT PALACE PKWY REPAIR INVOICE.pdf, 4. 20-10003 FIS 620.93.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

From

Carmen Ard                     

 

Title

Ratification of an emergency purchase from North Texas Contracting, Inc. for the repair of a water leak on a 30 inch water main on the west side of Beltline Road on the north side of the Trinity River at Palace Parkway in the amount of $503,460, plus a 5% contingency of $25,173., for a total of $528,633

 

Presenter

Gabe Johnson, Director of Public Works

 

Recommended Action

Approve

 

Analysis

On February 29, 2020, the City discovered a water leak on the 30"water line located on the west side of Beltline Road on the north side of the Trinity River at Palace Parkway. It was necessary to employ a contractor to complete this repair to install a 30” butterfly valve to stop the flow of water between Refugee Way and Palace Parkway without shutting off services to the warehouse district to the north. The City does not have the in-house capability to perform such a repair.

 

The leak affected water service to such a large area an immediate response was critical, and therefore essential to restore the connection as soon as possible. 

 

Local Government Code 252 allows for an exemption from the bid process for procurement necessary because of unforeseen damage to public machinery, equipment, or other property.  Due to critical nature of emergency, we requested and were approved to waive the normal bidding procedures and awarded contract to North Texas Contracting, Inc. in the amount of $355,678.

 

Financial Consideration

Funding for the emergency purchase for repair of the 30” water main on Beltline Rd at Palace Parkway from North Texas Contracting, Inc. in the amount of $528,633 is available in the Water Capital Projects Fund (500592) WO #02009303 (FY20 Water Main  Replacements)