Legislation Details

File #: 20-10128    Version: 1 Name: Emergency Repair - Lakeridge at S. GSW
Type: Agenda Item Status: Consent Agenda
File created: 6/30/2020 In control: Public Works
On agenda: 7/14/2020 Final action: 7/14/2020
Title: Ratification of an emergency purchase to North Texas Contracting, Inc. for the repair of a water leak on a 12 inch water main line on the east side of Lake Ridge Parkway at High Hawk Blvd./S. Great Southwest Parkway in the amount of $383,610, plus a 5% contingency of $19,181, for a total of $402,791
Attachments: 1. CC 20 -10128 - Ratification Emergency Water Repair - Lakeridge at GSW Exhibit.docx.pdf, 2. CC 20 -10128 - Ratification Emergency Water Repair - Lakeridge at GSW Pay App.docx.pdf, 3. CIP Impact form CC 20 -10128 .pdf

From

Carmen Ard                     

 

Title

Ratification of an emergency purchase to North Texas Contracting, Inc. for the repair of a water leak on a 12 inch  water main line on the east side of Lake Ridge Parkway at High Hawk Blvd./S. Great Southwest Parkway in the amount of $383,610, plus a 5% contingency of $19,181, for a total of $402,791

 

Presenter

Gabe Johnson, Director of Public Works

 

Recommended Action

Approve

 

Analysis

On December 12, 2019, we discovered a water leak on the 12"water line located on the east side of Lakeridge Parkway at High Hawk Blvd/S. Great Southwest Parkway. Once the contractor identified the failed section of 12” water main it was determined, several issues led to the precipitous deterioration of the pressure reinforced concrete cylinder pipe (RCCP). The repair included removing and installing a new 12” water main line from the east side of Lakeridge Parkway to the west side by the contractor. We do not have the in-house capability to perform such a reparation.

 

The leak affected water service to such a large area an immediate response was critical, and therefore essential to restore the connection as soon as possible. 

 

Local government code 252 allows for an exemption from the bid process for procurement necessary because of unforeseen damage to public machinery, equipment, or other property.  Due to critical nature of emergency, we requested and were approved to waive the normal bidding procedures and awarded contract to North Texas Contracting, Inc. in the total amount of $402,791.

 

Financial Consideration

Funding for the emergency purchase for repair of the 30” water main on Lakeridge Parkway at High Hawk Blvd/S. Great Southwest Parkway from North Texas Contracting, Inc. in the amount of $402,791 is available in the Water Capital Projects Fund (500592) WO #02009303 (FY20 Water Main Replacements)