File #: 20-10441    Version: 1 Name: Ordinance; Construction contract with Gomez Brothers Construction for Brent Court Storm Drainage Improvements
Type: Ordinance Status: Adopted
File created: 10/2/2020 In control: Engineering
On agenda: 10/13/2020 Final action: 10/13/2020
Title: Ordinance amending the FY 2020/2021 Capital Improvement Projects Budget; Construction contract with Gomez Brothers Construction, Inc. for Brent Court Storm Drainage Improvements in the total amount of $387,046.00; material testing with Team Consultants in the amount of $14,377.80; in-house engineering in the amount of $19,352.30; and 5% construction contract contingency in the amount of $19,352.30 for a total project cost of $440,128.40
Attachments: 1. Brent CT Storm Drain Improvements recommendation for final acceptance 10-01-20.pdf, 2. 20-10441 W.O. 619.58.pdf
From
Max

Title
Ordinance amending the FY 2020/2021 Capital Improvement Projects Budget; Construction contract with Gomez Brothers Construction, Inc. for Brent Court Storm Drainage Improvements in the total amount of $387,046.00; material testing with Team Consultants in the amount of $14,377.80; in-house engineering in the amount of $19,352.30; and 5% construction contract contingency in the amount of $19,352.30 for a total project cost of $440,128.40

Presenter
Gabe Johnson, Director of Public Works and Romin Khavari, City Engineer

Recommended Action
Approve

Analysis
On Tuesday, September 29, 2020, the City of Grand Prairie opened bids for Brent Court Storm Drainage Improvements, (W.O. #619.58). The low bidder is Gomez Brothers Construction, Inc. in the total bid amount of $387,046.00.

This project was identified as part of the FY19 Capital Projects Budget and Capital Projects Plan for proposed drainage projects. The Brent Court Storm Drainage Improvements, (W.O. #619.58) project provides for underground storm drainage improvements in Marshall Drive at and in Brent Court to address street flooding problems at this location.

The Brent Court Storm Drainage Improvements project is part of the City-Wide Master Drainage Plan for storm drainage improvements in the Cottonwood Creek watershed area of the City.
This project provides for installation of 749 linear feet of 30-inch diameter reinforced concrete storm drainage pipe, 259 linear feet of 24-inch diameter reinforced concrete storm drainage pipe, three 20-foot wide street curb drainage inlets in Marshall Drive, replacement of four existing 10-foot wide street curb drainage inlets in Brent Court and Crooks Court, over 910 square yards of asphalt overlaid concrete pavement replacement, replacement of conflicting water and wastewater services and other items necessary for construction as detailed in the plans and specifications.

Company Base Bid Total Bid