Legislation Details

File #: 20-10639    Version: 1 Name: Master Thoroughfare Plan Amendments to reclassify Westchester Pkwy from Deckhman Dr to the City Limit (east) and to reclassify Westcliff Rd from I-20 EB FR to E. Bardin Rd.
Type: Agenda Item Status: Agenda Ready - Committee
File created: 11/25/2020 In control: Transportation
On agenda: 2/2/2021 Final action:
Title: Master Thoroughfare Plan Amendments to reclassify Westchester Parkway from Dechman Dr. to the City Limit (east); and to reclassify Westcliff Rd. from I-20 EB Frontage to E Bardin Road
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
From
Brett Huntsman

Title
Master Thoroughfare Plan Amendments to reclassify Westchester Parkway from Dechman Dr. to the City Limit (east); and to reclassify Westcliff Rd. from I-20 EB Frontage to E Bardin Road

Presenter
Walter Shumac III, Director of Transportation Services

Recommended Action
Approve

Analysis
Westchester Parkway: The Master Thoroughfare Plan (MTP) identifies Westchester Parkway from Dechman Dr. to the City Limit (east) as a principal arterial 4-lane divided (P4D).

City staff recommends downgrading this section of roadway to a minor arterial, 4-lane undivided (M4U). This designation would match the existing segment of Westchester to the west of Dechman Dr. and to remove design restrictions imposed by the minimum standards per the Grand Prairie Unified Development Code (UDC).

Downgrading the roadway classification to a M4U changes the horizontal radius from 1050’ to 775’ and reduces right-of-way requirements from 100’ to 70’. These changes allow for sharper turns and less required right-of-way, thereby reducing the impact of the roadway on existing development as well as minimizing impact to future development of the area.

The transition from a M4U to a P4D can create challenges in the transition between the roadway segment types. The proposed change allows for a continuous road segment and simplifies future intersection control methods.

City staff recommends reclassifying Westchester Parkway.

Westcliff Rd: The MTP identifies Westcliff Rd. from I-20 EB Frontage to E Bardin Rd as a minor arterial 3-lane undivided (M3U).

City staff recommends upgrading this section of roadway to a minor arterial, 4-lane undivided (M4U). This change will create additional north/south carrying capacity. The additional lanes will produce a net increase on capacity for the area with the downgrading of Westchester Pkwy.

Upgrading the roadway classification will require an additional 10’ of right-of-way to accommodate the new section type.

City ...