Legislation Details

File #: 17-6488    Version: 1 Name: Design Services for Rock Island Road Bridge Replacement at Bear Creek
Type: Agenda Item Status: Agenda Ready - Committee
File created: 2/8/2017 In control: City Council Development Committee
On agenda: 2/14/2017 Final action:
Title: Design Services for Rock Island Road Bridge Replacement at Bear Creek
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
From
max

Title
Design Services for Rock Island Road Bridge Replacement at Bear Creek

Presenter
Romin Khavari, City Engineer

Recommended Action
Approve

Analysis
In 2012, Dallas County engaged Kimley-Horn (KH) to provide a Bridge Scour and Bridge Condition Assessment Study. The study noted that erosion presented a significant risk to the bridge’s substructure. Since funding was not immediately available at the time to implement the Study’s preferred technical alternative of replacing the bridge, an interim erosion mitigation measure was proposed. In 2013 Dallas County engaged KH to design the interim erosion mitigation measure to protect the bridge’s header banks and abutments against further erosion and to structurally reinforce the bridge bents. Under this proposed scope and fee, the City of Grand Prairie and Dallas County have requested KH to perform the tasks necessary to develop the preliminary design to replace the existing bridge with a new bridge.

The ultimate typical street section for Rock Island Road will be four-lane divided. The proposed crossing at Bear Creek will be two, twin bridges matching the 4-lane divided typical section and will be approximately 320-feet long. A hydrologic and hydraulic study will be performed on Bear Creek as a part of this scope to determine the length and elevation of the bridge structures. Under this scope of services, only the preliminary design for both (twin) bridges will be provided. The City and County will phase the implementation of the ultimate road and bridge improvements by just building one of the two proposed bridges. The length of embankment and roadway improvements beyond the ends of the new bridge will be limited to the shortest distance that will allow the roadway to tie back into the existing two-lane roadway. Preliminary design for the demolition of the existing bridge, approaches, and header banks will also be provided to improve existing channel geometry and to reduce stream velocities and ...

Click here for full text