Fish Creek Alignment Study
Presenter
Romin Khavari, City Engineer
Analysis
With the anticipated development along the section of Fish Creek Road from Belt Line Road East past the dog leg south to the proposed future I-20 Frontage road and existing bridge across I-20 there is a need to perform a preliminary roadway design to ensure that future development will address anticipated future city traffic in this area. consideration is also be given to take our the existing dog-leg along the roadway to provide a safer and smoother transition.
Staff is proposing to hire an Engineer to perform preliminary surveying and design to provide an alignment and to include associated costs estimate for future roadway improvements to include any associated utility adjustment and relocations.
Cost associated with this work is anticipated to be around $170,000 to be funded from un-obligated Street Capital Funds.