File #: 19-9127    Version: 1 Name: Ordinance; Professional Contract with Freese and Nichols, Inc. for the engineering design of the Sanitary Sewer and electrical Improvements for Loyd Park in the not to exceed amount of $314,845
Type: Ordinance Status: Adopted
File created: 7/5/2019 In control: Engineering
On agenda: 8/6/2019 Final action: 8/6/2019
Title: Ordinance amending the FY 2018/2019 Capital Improvement Projects Budget; Professional Engineering and surveying Contract with Freese and Nichols, Inc. for the engineering design of the Sanitary Sewer and electrical Improvements for Loyd Park in the not to exceed amount of $314,845
Attachments: 1. 19-9127 Loyd Park.pdf

From

max

 

Title

Ordinance amending the FY 2018/2019 Capital Improvement Projects Budget; Professional Engineering and surveying Contract with Freese and Nichols, Inc. for the engineering design of the Sanitary Sewer and electrical Improvements for Loyd Park in the not to exceed amount of $314,845

 

Presenter

Duane Strawn, Assistant Parks, Arts and Recreation Director

 

Recommended Action

Approve

 

Analysis

On March 3, 2015 the City Council awarded a professional Engineering contract with Freese and Nichols, Inc. (15-4311) for engineering design of adequate roadway, storm drainage, and water and wastewater systems of Ragland Road, Day Miar and Connector roads east of SH 360. As part of this contract, the City approved c/o 1 on August 1, 2016 for providing a wastewater master plan for Loyd Park camp sites.

 

The current professional Engineering contract with Freese and Nichols, Inc. in the not to exceed amount of $314,845 will include design of the sanitary sewer improvement for Loyd Park loops A, F and G and electrical improvement for loops A, F,G and B.

Upon design completion, Loop B Electrical will bid as added alternate to the construction contract.

 

A summary of the items included as part of this project:

 

- Sanitary Sewer Improvements for Loops A, F and G. These improvements include 5200 linear feet of 6" SS and Service connections for all pad sites in these loops as well as appurtenances and pavement repair.

 

- 30' wide survey of Loops A, F and G

 

-Electrical system upgrades for Loops A, F, G and Loop B will provide 20A, 30A and 50A, 120V receptacles at each Camp site. The proposed upgrades include replacing the existing transformers and distribution panels serving the campsites in order to accommodate increased load.

 

-Environmental Coordination will include a pedestrian survey, a technical memorandum documenting finding and a submittal to the Texas Historical Commission as required for a project of this size.

 

-TRA Coordination of two Point of Entry Permits

 

-Easements for the Work within Loyd Park and an Easement application to the United States Corps of Engineering is not included.  This is based on a coordination meeting where the Lake Manager and Several USACE Real Property personnel agreed that these were park improvements which fall under the existing lease agreement.

 

Project design is anticipated to begin in August 2019, 2020. Construction is anticipated to start in February 2020 with completion in May 2020.

 

Financial Consideration

Funding for professional Engineering and surveying Contract with Freese and Nichols, Inc. for the engineering design of the Sanitary Sewer and electrical Improvements for Loyd Park, in the not to exceed amount of $314,845, is available by approving an ordinance transferring and appropriating from the unobligated fund balance in Lake Capital Projects Fund (318793) to WO #01917403 (Loyd Park Elec & SS)

 

Body

AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS, AMENDING THE FY 2018/2019 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $314,845 FROM THE UNOBLIGATED FUND BALANCE IN THE LAKE CAPITAL PROJECTS FUND (318793) TO WO #01917403 (LOYD PARK ELEC & SS)

 

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS:

 

SECTION 1.  THAT THE FY 2018/2019 Capital Improvement Projects Budget be amended by transferring and appropriating $314,845 from the unobligated fund balance in the Lake Capital Projects Fund (318793) to WO #01917403 (Loyd Park Elec & SS)

 