Skip to main content
File #: 19-9179    Version: 1 Name: Ordinance; Change Order/Amendment No. 1 for Professional Consultant Services with Pacheco Koch, LLC for Dickey Road Improvements
Type: Ordinance Status: Adopted
File created: 7/25/2019 In control: Engineering
On agenda: 8/6/2019 Final action: 8/6/2019
Title: Ordinance amending the FY 2018/2019 Capital Improvement Projects Budget; Dickey Road Storm Drain Improvements, West of SW 3rd Street Change Order/Amendment No.1 to Engineering Professional Consultant Services contract with Pacheco Koch, LLC. in the amount of $50,486
Attachments: 1. 19-9179 WTR.pdf, 2. 2019-01-17_Dickey Road Drainage Improvements- Amendment #1.pdf, 3. 19-9179 WWST

From

Max

 

Title

Ordinance amending the FY 2018/2019 Capital Improvement Projects Budget; Dickey Road Storm Drain Improvements, West of SW 3rd Street Change Order/Amendment No.1 to Engineering Professional Consultant Services contract with Pacheco Koch, LLC. in the amount of $50,486

 

Presenter

Gabe Johnson, Director of Public Works and Romin Khavari, City Engineer

 

Recommended Action

Approve

 

Analysis

February 5, 2019, the City of Grand Prairie awarded a design contract in the amount of $122,369.00 to Pacheco Koch, LLC to provide design plans for storm drainage improvements in Dickey Road, west of SW 3rd Street to Shawnee Trace (maximum 2200 feet long) paralleling the existing storm drain line as per the recommendations from the 2016 Study of the Indian Hills area.

 

During the design process, it was determined that the existing water and wastewater mains are old and it would be prudent to replace these mains in conjunction with this storm drain improvement project. This Change Order/Amendment No. 1 in the total amount of $50,486.00 to the contract provides $22,905.00 for the design of needed water line replacements and $27,581 for the design of needed wastewater line replacements in Dickey Road from SW 3rd Street to Shawnee Trace. The recommended water and wastewater replacements replaces old, expended water and wastewater lines with new lines to help maintain water facility services for this area of Dickey Road. Construction funding is to be provided as part of the FY 2020 CIP Budget.

 

Design of this project is currently in progress with anticipated completion in December 2019. This engineering services contract will last until construction of this project is completed estimated to be in 2021.

 

Financial Consideration

Original funding for this contract was executed with Storm Water Capital Improvement Funds. However, this change order/amendment is specific to water and wastewater design.

 

Funding in the total amount of $50,486 is available as follows:

 

1. $22,905 is available by transferring and appropriating from the unobligated fund balance in the Water Capital Projects Fund (500592 to WO #01917503 (Dickey WTER)

2. $27,581 is available by transferring and appropriating from the unobligated fund balance in the Wastewater Capital Projects Fund (500692) to WO #01917603 (Dickey WWST)

 

Body

AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS, AMENDING THE FY 2018/2019 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $22,905 FROM THE UNOBLIGATED FUND BALANCE IN THE WATER CAPITAL PROJECTS FUND (500592) WO #01917503 (DICKEY WTER) AND $27,581 FROM THE UNOBLIGATED FUND BALANCE IN THE WASTEWATER CAPITAL PROJECTS FUND (500692) WO #01917603 (DICKEY WWST)

 

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS:

 

SECTION 1.  THAT THE FY 2018/2019 Capital Improvement Projects Budget be amended by transferring and appropriating $22,905 from the unobligated fund balance in the Water Capital Projects Fund (500592) WO #01917503 (Dickey WTER)

 

SECTION 2.  THAT THE FY 2018/2019 Capital Improvement Projects Budget be amended by transferring and appropriating $27,581 from the unobligated fund balance in the Wastewater Capital Projects Fund (500692) WO #01917603 (Dickey WWST)

 

PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS, AUGUST 6TH, 2019.