File #: 16-5678    Version: 1 Name: Ordinance; Change Order/Amendment No.8 with North Texas Contracting, for the South Sector Lift Station in the amount of $84,305 for Lift Station sluice gate and odor control unit
Type: Ordinance Status: Adopted
File created: 5/25/2016 In control: Engineering
On agenda: 6/7/2016 Final action: 6/7/2016
Title: Ordinance amending the FY 2015/2016 Capital Improvement Projects Budget; Change Order/Amendment No. 8 with North Texas Contracting, for the South Sector Lift Station in the amount of $84,305 for Lift Station sluice gate and odor control unit
Attachments: 1. 16-5678 South Sector.pdf

From

max

 

Title

Ordinance amending the FY 2015/2016 Capital Improvement Projects Budget; Change Order/Amendment No. 8 with North Texas Contracting, for the South Sector Lift Station in the amount of $84,305 for Lift Station sluice gate and odor control unit

 

Presenter

Ron McCuller, Director of Public Works

 

Recommended Action

Approve

 

Analysis

On March 2, 2010 the City of Grand Prairie awarded a construction contract to North Texas Contracting in the amount of $2,377,737.00 and approved a 5% contingency of $118,887.00 for a total of $2,496,624.00 for the South Sector lift station construction project.

 

Construction of this project was initiated in March 2010 with a planned one year term. This term was extended to mid-2012 based on the local electric service provider, Hilco, having power to the lift station; however, power was not available from Hilco until early 2013.  Additionally, planned development to be served by the lift station was put on hold in mid-2013, so a decision was made by the City and the contractor to await the need for the station prior to remobilizing the contractor to perform equipment performance testing.  

 

In mid-2015, the City requested the contractor to furnish costs for initiating a facility wide review and testing of all the equipment and a performance testing of the lift station in its entirety in order to confirm that the lift station can be available for connections to City and Mansfield developments as soon as the first quarter of 2016.

 

This change order/Amendment No. 8 provides for installation of a sluice gate to control sewer flows into the lift station and the removal and replacement of the Odor control unit at the lift station to allow clearance for the South Sector gravity outfall installation at the lift station The gravity outfall connection into the lift station was modified to accommodate future flows from the City of Mansfield.

 

Change Order/Amendment No. 8 was presented to Finance & Government on June 7, 2016.

 

Completion of construction is scheduled for July 29, 2016.

 

Change order No.1 in the net amount of negative (-$5,745.00) for addition and deletion of pipe fittings, couplings and other related items of work.

 

Change order No.2 provided for time extension.

 

Change Order No. 3 in the amount of $2,156.25 provided for revision to refrigerant and insulation lines.    

 

Change order No.4 in the amount of $24,379.08 provided for copper wiring to extend power from Hilco lines to the lift station site. 

 

Change order No.5 provided for time extension.

 

Change order No. 6 in the amount of $50,173 provided for comprehensive testing of equipment and performance testing of pumps for startup operations.

 

Change order No. 7 in the amount of $39,406 provided for pump start-up and equipment replacement.

 

Financial Consideration

Funding in the total amount of $84,305 is available as follows:

 

1. $11,190 is available in Wastewater Capital Project Fund (500692) WO #07712303 (South Sector WWST) 68540 contract contingency C10072

2. $73,115 is available by appropriating and transferring from the unobligated fund balance of Wastewater Capital Projects Fund (500692) to WO #07712303 (South Sector WWST) 68540 (Constuction).

 

Body

AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS, AMENDING THE FY 2015/2016 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $73,115 FROM THE UNOBLIGATED FUND BALANCE IN THE WASTEWATER CAPITAL PROJECTS FUND (500692) WO #07712303 (SOUTH SECTOR WWST)

 

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS:

 

SECTION 1.  THAT THE FY 2015/2016 Capital Improvement Projects Budget by amended by transferring and appropriating $73,115 from the unobligated fund balance in the Wastewater Capital Projects Fund (500692) WO #07712303 (South Sector WWST) 68540 (Construction).

 

PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS, JUNE 7TH, 2016.