File #: 20-10301    Version: 1 Name: Ordinance; Construction contract with La Banda, LLC for Dickey Road Storm Drain Improvements West of SW 3rd Street
Type: Ordinance Status: Adopted
File created: 8/20/2020 In control: Engineering
On agenda: 9/1/2020 Final action: 9/1/2020
Title: Ordinance amending the FY 2019/2020 Capital Improvement Projects Budget; Construction contract with La Banda, LLC for Dickey Road Storm Drain Improvements West of S.W. 3rd Street in the total amount of $2,139,761; material testing with Team Consultants in the amount of $53,494; in-house engineering in the amount of $106,988; and 5% construction contract contingency in the amount of $106,988 for a total project cost of $2,407,231
Attachments: 1. 4226-19.063_2020-08-19_Letter of Recommendation.pdf, 2. WO 619.64.pdf, 3. WO 619.175 WTER.pdf, 4. WO 619.176 WWST.pdf

From

Max

 

Title

Ordinance amending the FY 2019/2020 Capital Improvement Projects Budget; Construction contract with La Banda, LLC for Dickey Road Storm Drain Improvements West of S.W. 3rd Street in the total amount of $2,139,761; material testing with Team Consultants in the amount of $53,494; in-house engineering in the amount of $106,988; and 5% construction contract contingency in the amount of $106,988 for a total project cost of $2,407,231

 

Presenter

Gabe Johnson, Director of Public Works and Romin Khavari, City Engineer

 

Recommended Action

Approve

 

Analysis

On Tuesday, August 18, 2020, the City of Grand Prairie opened bids for Dickey Road Storm Drain Improvements West of S.W. 3rd Street.  The low bidder is La Banda, LLC in the total bid amount of $2,139,761.00.

 

This project was identified as part of the FY19 Capital Projects Budget and Capital Projects Plan for proposed drainage improvements extending from SW 3rd Street to Indian Hills Drive. During the design process it was determined that the existing water and wastewater mains were old and that it was prudent to replace the water main (from SW 3rd  Street to Shawnee Trace) and wastewater mains (from Dawson Circle to Ralph Street and at street crossings to connect to existing mains) in conjunction with the storm drain improvement project. The Dickey Road Storm Drain Improvements West of S.W. 3rd Street, project provides for underground storm drainage, water and wastewater improvements to replace old water and wastewater lines in Dickey Road and provides a 100-year storm capacity storm drainage system in Dickey Road between SW 3rd Street and Indian Hills Drive.

 

The Dickey Road Storm Drain Improvements West of S.W. 3rd Street project is part of the City-Wide Master Drainage Plan for storm drainage improvements in the Indian Hills area of the City.

This project provides for installation 1500 linear feet of 36-inch diameter reinforced concrete pipe, 2450 linear feet of 8-inch diameter water main pipe, 960 linear feet of 8-inch diameter wastewater main pipe, over 5600 square yards of concrete pavement panel replacement to ensure a good connection to existing pavement due to otherwise multiple cuts and existing pavement condition, 165 cubic yards of unclassified channel excavation, 12 street curb inlets with sizes ranging from 5 feet to 20 feet and other items necessary for construction as detailed in the plans and specifications owned properties.

 

Company                                                                                                                                                                                      Base Bid                                                                                Total Bid                                                                                                                                                                                                                                                                                 

La Banda LLC                                                                                                                                                                                                           $2,139,761.00                                                                                            $2,139,761.00                       

North Texas Contracting                                                                                                     $2,181,805.00                                                                                             $2,181,805.00

SYB Construction Company, Inc.                                                                                    $2,231,582.50                                                                      $2,231,582.50

Jackson Construction, Ltd.                                                                                                                              $2,283,874.00                                                                                                         $2,283,874.00

SJ&J CONSTRUCTION, LLC                                                                                    $2,451,191.00                                                                                                         $2,451,191.00

SEMA Construction, Inc.                                                                                                                               $2,634,670.00                                                                                         $2,634,670.00                     

BAR Constructors, Inc.                                                                                                                              $2,951,280.00                                                                                                         $2,951,280.00

Excel Trenching                                                                                                                                                                        $3,110,095.00                                                                                                         $3,110,095.00

 

Construction of this project is scheduled to begin around the first week of October 2020 with projected completion around August 2021.

 

Financial Consideration

Funding in the total amount of $2,407,231 is available as follows:

 

1. $1,113,360 is available in Storm Drainage Capital Projects Fund (401592) WO #01906403 (Dickey Road Storm Drain Improvements)

2. $373,125 is available in Water Capital Projects Fund (500592) WO #01917503 (Dickey Rd WTER)

3. $529,830 is available by approving an ordinance appropriating and transferring from the unobligated fund balance in the Water Capital Projects Fund (500592) WO #01917503 (Dickey Rd WTER)

4. $310,000 is available in Wastewater Capital Projects Fund (500692) WO #01917603 (Dickey Rd WWST)

5. $80,916 is available by approving an ordinance appropriating and transferring from the unobligated fund balance in the Wastewater Capital Projects Fund (500692) WO #01917603 (Dickey Rd WWST)

 

Body

AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS, AMENDING THE FY 2019/2020 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $373,125 FROM THE UNOBLIGATED FUND BALANCE IN THE WATER CAPITAL PROJECTS FUND (500592) WO #01917503 (DICKEY RD WTER) AND $80,916 FROM THE UNOBLIGATED FUND BALANCE IN THE WASTEWATER CAPITAL PROJECTS FUND (500692) WO #01917603 (DICKEY RD WWST)

 

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS:

 

SECTION 1.  THAT THE FY 2019/2020 Capital Improvement Projects Budget be amended by transferring and appropriating $373,125 from the unobligated fund balance in the Water Capital Projects Fund (500592) WO #01917503 (Dickey Rd WTER)

 

SECTION 2.  THAT THE FY 2019/2020 Capital Improvement Projects Budget be amended by transferring and appropriating $80,916 from the unobligated fund balance in the Wastewater Capital Projects Fund (500692)  WO #01917603 (Dickey Rd WWST)

 

PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS, SEPTEMBER 1, 2020.