From
Monica Espinoza, Executive Assistant
Title
P201103 - Preliminary Plat - Hamilton Bardin Village (City Council District 4). Preliminary Plat for Hamilton Bardin Village, Lots 1-6, Block 3R, creating six lots on 21.803 acres. Sheffield Village Addition Phase 4, 5, and 6, Block 3, Lot B, City of Grand Prairie, Tarrant County, Texas, zoned PD-395, within the SH-360 Corridor Overlay District, generally located south of I-20, east of SH-360, and north of Bardin Rd, and addressed as 3025 W I-20.
Presenter
Savannah Ware, AICP, Chief City Planner
Recommended Action
Approve
Analysis
SUMMARY:
Preliminary Plat for Hamilton Bardin Village, Lots 1-6, Block 3R, creating six lots on 21.803 acres. Sheffield Village Addition Phase 4, 5, and 6, Block 3, Lot B, City of Grand Prairie, Tarrant County, Texas, zoned PD-395, within the SH-360 Corridor Overlay District, generally located south of I-20, east of SH-360, and north of Bardin Rd, and addressed as 3025 W I-20.
PURPOSE OF REQUEST:
The purpose of the Preliminary Plat is to create six lots on 21.803 acres to facilitate development of Hamilton Bardin Village, a horizontal mixed-use development. The Site Plan for Phase One of this development is under concurrent review (Case Number S201101).
ADJACENT LAND USES:
The following table summarizes the zoning designation and existing use for the surrounding properties.
|
Table 1: Adjacent Zoning and Land Uses |
|
Direction |
Zoning |
Existing Use |
|
North |
PD-37A; PD-327 |
Light Industrial, Commercial, Retail |
|
South |
PD-140 |
Medical Offices, Multi-Family |
|
|
PD-140B |
Undeveloped |
|
West |
City Limits |
City Limits |
|
East |
PD-140 |
Concorde Career College; Church |
PLAT FEATURES:
The plat depicts the necessary utility and access easements and meets the applicable dimensional standards.
RECOMMENDATION:
The Development Review Committee (DRC) recommends approval with the condition that the plat adheres to the standards set forth in the UDC and the following:
1. The applicant shall establish easements by a separate instrument for the off-site improvements that will be constructed with Phase One but not final platted with Phase One. The recording information for the easements shall be shown on the final plat for Phase One.
2. The final plat shall provide a 15 ft. utility easement along all street frontages.