Legislation Details

File #: 18-7748    Version: 1 Name: Ordinance; Change Order/Amendment No. 3 with North Texas Contracting, Inc. in the amount of $65,005.40 for Water Utilities Facility Improvements - Phase 1
Type: Ordinance Status: Adopted
File created: 3/23/2018 In control: Engineering
On agenda: 4/3/2018 Final action: 4/3/2018
Title: Ordinance amending the FY 2017/2018 Capital Improvement Projects Budget; Change Order/Amendment No. 3 with North Texas Contracting, Inc. in the amount of $65,005.40 for Water Utilities Facility Improvements- Phase 1
Attachments: 1. 18-7748 Small Hill

From

max

 

Title

Ordinance amending the FY 2017/2018 Capital Improvement Projects Budget; Change Order/Amendment No. 3 with North Texas Contracting, Inc. in the amount of $65,005.40 for Water Utilities Facility Improvements- Phase 1

 

Presenter

Gabriel Johnson, Director of Public Works

 

Recommended Action

Approve

 

Analysis

On July 18, 2017 (17-6866) the City Council approved a construction project with North Texas Contracting, Inc. providing for a paved Access to the materials storage bunkers at 620 Small Hill Water Utilities Facility; it also provides for drainage improvements, Security fencing and relocation of a steel building to a new reinforced concrete slab.  Council approved the base bid only amount of $1,126,567.99 for Water Utilities Facility Improvements- Phase 1, Material testing with TEAM Consultants Inc. in the amount of $29,719.50; 5% contract contingency in the amount of $56,328; In-house engineering in the amount of $56,328 for a total project cost of $1,268,943.49

 

The current Change Order/Amendment No. 3 in the amount of $65,005.40 provides for additional 12" grouted rock rip-rap, concrete pavement and removal and replacement of additional chain link fence with barbed wire & mow strip along top of bank to match the existing.

 

Change Order/Amendment No. 1 in the amount of $4,720 was approved by the City on November 21, 2107. Change Order/Amendment No. 1 allowed for the construction of a reinforced concrete headwall, additional rock rip-rap and remove and disposal of existing chain link and wood fencing.

 

Change Order/Amendment No. 2 in the amount of $28,573.00 was approved by the City on February 2, 2018. Change Order/Amendment No. 2 allowed for additional rock rip-rap, electrical improvements, and additional reinforced concrete pavement.

 

Project completion date is revised until May 14, 2018.

 

Financial Consideration

Funding in the total amount of $65,006 is available as follows:

 

1. $23,035 is available in Water Capital Projects Fund (500592) WO #01710303 (Beltline Facility) North Texas Contracting, Inc. construction contract (229002) Contingency.

2. $36,027  is available in Water Capital Projects Fund (500592) WO #01710303 (Beltline Facility)

2. $5,944 is available by transferring and appropriating from the unobligated fund balance in the Water Capital Projects Fund (500592) to WO #01710303 (Beltline Facility)

 

Body

AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS, AMENDING THE FY 2017/2018 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $5,944 FROM THE UNOBLIGATED FUND BALANCE IN THE WATER CAPITAL PROJECTS FUND (500592) WO #01710303 (BELTLINE FACILITY)

 

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS:

 

SECTION 1.  THAT THE FY 2017/2018 Capital Improvement Projects Budget be amended by transferring and appropriating $5,944 from the unobligated fund balance in the Water Capital Projects Fund (500592) WO #01710303 (Beltline Facility)

 

PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS, APRIL 3, 2018.