Skip to main content
File #: 16-6313    Version: 1 Name: Contract amendment No. 2 for engineering and surveying services with Salcedo Group, Inc. for Oakdale Culvert Drainage Improvements
Type: Agenda Item Status: Consent Agenda
File created: 12/1/2016 In control: Engineering
On agenda: 12/13/2016 Final action: 12/13/2016
Title: Contract amendment No. 2 for Engineering and Surveying Services with Salcedo Group, Inc. for Oakdale Culvert Drainage Improvements in the total amount of $11,045
Attachments: 1. 16-6313 Salcedo.pdf

From

max

 

Title

Contract amendment No. 2 for Engineering and Surveying Services with Salcedo Group, Inc. for Oakdale Culvert Drainage Improvements in the total amount of $11,045

 

Presenter

Romin Khavari, City Engineer

 

Recommended Action

Approve

 

Analysis

On Tuesday, December 1, 2015 the City of Grand Prairie awarded a professional services contract to Salcedo Group, Inc. in the amount of $38,960 for a feasibility study to determine preferred locations and culvert sizes for a drainage relief system across Oakdale Road between Belt Line Road and SH 161. During the storms of 2010 drainage backed up to the north behind Oakdale Road creating flooding and traffic problems on Belt Line Road at Oakdale Road. The Salcedo Group has recommended three optimum culvert locations for placement of the box culverts along Oakdale Road for flood relief consisting of four 4’ by 4’ reinforced concrete box culverts at each location.

 

The current proposed contract proposed Amendment No. 2 will provide the additional professional services to bid and construct the proposed drainage culvert improvements.

 

Contract Amendment No. 1 approved on December 2, 2017 for $10,770 was to prepare the design plans for the proposed drainage culvert improvements.

 

This project will provide construction plans for the construction of four 4-foot by 4-foot box shaped reinforced culverts across Oakdale Road at three locations: approximately 335 feet, 755 feet and 3,780 feet west of the centerline of Belt Line Road.

 

Construction of this project is scheduled to begin around March 2017 with projected completion around August 2017.

 

Financial Consideration

State statutes require City Council approval of an amendment/change order when the cumulative cost of a contract exceeds $50,000. Total contract amount after approval of this amendment will be $60,775.00.

 

Funding in the total amount of $11,045 is available in Stormwater Capital Projects Fund (401592) WO #01304703 (Oakdale Culvert Improvements) 68560 (Eng/Con/Geo).