File #: 17-6796    Version: 1 Name: Ordinance; c/o 2 w/Canary Construction for Main Street Water and Wastewater Improvements behind 321 W. Main St from Center to NW 6th
Type: Ordinance Status: Adopted
File created: 5/19/2017 In control: Engineering
On agenda: 6/6/2017 Final action: 6/6/2017
Title: Ordinance amending the FY 2016/2017 Capital Improvement Projects Fund; Amendment/Change Order No. 2 with Canary Construction, Inc. in the net amount of $32,718.40 for Main Street Water and Wastewater Improvements behind 321 W. Main Street from Center Street to NW 6th Street project
Attachments: 1. 617.107 WTER 321 W Main.pdf, 2. 617.116 WWST 321 W Main.pdf

From

max

 

Title

Ordinance amending the FY 2016/2017 Capital Improvement Projects Fund; Amendment/Change Order No. 2 with Canary Construction, Inc. in the net amount of $32,718.40 for Main Street Water and Wastewater Improvements behind 321 W. Main Street from Center Street to NW 6th Street project

 

Presenter

Ron McCuller, Director of Public Works, and Romin Khavari, City Engineer

 

Recommended Action

Approve

 

Analysis

On September 20, 2016, the City of Grand Prairie awarded a construction contract to Canary Construction, Inc. in the amount of $620,915.00 and approved a 5% contingency of $31,046 for a total of $651,961.00 for the Main Street Water and Wastewater Improvements behind 321 W. Main Street from Center Street to NW 6th Street project.

 

The current Amendment/Change Order No. 2 in the net amount of $32,718.40 (additions of $66,184.40 and deductions of -$33,466.00) provides for additional pavement repair quantities due to the condition of the existing pavement adjacent to the trenches for the water and wastewater lines, as well as poorly compacted soil under some of the existing pavement that caused trench walls to slough off and undermine some of the existing pavement adjacent to the trenches.  Also included are some additional water and wastewater services that were discovered during construction and connected to the new water and wastewater mains.  This Amendment/Change Order No. 2 also provides for reconciliation of bid items on the project in advance of finalizing and closing the project.

 

Amendment/Change Order No. 1 approved by the City Council on February 21, 2017 in the net amount of $45,362.00 provided for additional water services, the replacement of some additional 10-inch water line at a connection to the existing 10-inch water line, additional water line valves fittings required to make the connection to the existing 10-inch water line, and replacement of 15-inch storm drain pipe at a water line crossing.  Also included were items for quick-setting concrete, light plants, and compensation for production slowdown for constructing the water and sewer lines through the parking lot of the buildings along the south side of the 100 block of W. Main Street.  The businesses present along this block use a majority of the parking spaces on a daily basis, so the contractor agreed to construct those lines at night in order to minimize disruptions to the daily operations of these businesses.

 

City staff recommends this change order for $32,718.40.  The current anticipated project completion date for this construction contract is June 30, 2017.

 

Financial Consideration

Funding in the amount of $32,720 is available as follows:

 

Water ($2,656):

1. $2,656 is available by appropriating and transferring from the unobligated fund balance of Water Capital Projects Fund (500592) to WO#01710703 (Water Replacement behind 321 W. Main St) 68540 (Construction)

 

WWST ($30,064):

1. $30,064 is available by appropriating and transferring from the unobligated fund balance of Wastewater Capital Projects Fund (500692) WO#01711603 (WWST Replacement behind 321 W. Main St) 68540 (Construction)

 

Body

AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS, AMENDING THE FY 2016/2017 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $2,656 FROM THE UNOBLIGATED FUND BALANCE IN THE WATER CAPITAL PROJECTS FUND (500592) WO#01710703 (WATER REPLACEMENT BEHIND 321 W. MAIN STREET) AND $30,064 FROM THE UNOBLIGATED FUND BALANCE IN THE WASTEWATER CAPITAL PROJECTS FUND (500692) WO#01711603 (WWST REPLACEMENT BEHIND 321 W MAIN ST)

 

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS:

 

SECTION 1.  THAT THE FY 2016/2017 Capital Improvement Projects Budget be amended by transferring and appropriating $2,656 from the unobligated fund balance in the Water Capital Projects Fund (500592) WO#01710703 (Water Replacement behind 321 W. Main)

 

SECTION 2.  THAT THE FY 2016/2017 Capital Improvement Projects Budget be amended by transferring and appropriating $30,064 from the unobligated fund balance in the Wastewater Capital Projects Fund (500692) WO#01711603 (WWST Replacement behind 321 W. Main St)

 

PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS, JUNE 6TH, 2017.