Legislation Details

File #: 19-9662    Version: 1 Name: Ordinance; Construction Contract for Loyd Park Electrical and Sanitary Sewer Improvements with Gra-Tex Utilities
Type: Ordinance Status: Adopted
File created: 12/20/2019 In control: Engineering
On agenda: 1/7/2020 Final action: 1/7/2020
Title: Ordinance amending the FY 2019/2020 Capital Improvement Projects Budget; construction contract with Gra-Tex Utilities in the amount of $2,558,259 for sanitary sewer and electrical improvements at Loyd Park; material testing with Kleinfelder Consultants in the amount of $23,513; contract contingency in the amount of $127,913; In-house labor distribution in the amount of $127,913 for a total project cost of $2,837,598
Attachments: 1. Recommendation of Award Letter Packet (002).pdf, 2. 619.174 Loyd Elec SS.pdf

From

max

 

Title

Ordinance amending the FY 2019/2020 Capital Improvement Projects Budget; construction contract with Gra-Tex Utilities in the amount of $2,558,259 for sanitary sewer and electrical improvements at Loyd Park; material testing with Kleinfelder Consultants in the amount of $23,513; contract contingency in the amount of $127,913; In-house labor distribution in the amount of $127,913 for a total project cost of $2,837,598

 

Presenter

Cheryl DeLeon, Parks, Arts and Recreation Director, Gabriel Johnson, Director of Public Works and Romin Khavari, City Engineer

 

Recommended Action

Approve

 

Analysis

On August 6, 2019 the City Council awarded a professional Engineering contract with Freese and Nichols, Inc. (19-9127) for design of sanitary sewer improvement of Loyd Park loops A, F and G and electrical improvement for loops A, F, G and B.

 

The City of Grand Prairie advertised and received a Total of Four (4) bids for this project On December 17, 2019 as follows: 

 

 

Contractor      Gra-Tex                                             North Texas                           Fort Worth Civil                                                Excel

                                           Utilities                                                Contracting                               Constructors, Inc.                                               Trenching                                                

Base Bid                     $2,337,167.00                                          $2,765,550.00                        $3,575,873.92                                                     $3,861,627.67                                          

Alternate A                     $283,520.00                                          $34,800.00                            $433,752.00                                                      $348,990.00                     

Alternate B                      $456,005.00                                          $391,600.00                            $874,892.50                                                   $1,104,449.00                                          

Alternate C    $210,208.00                                          $216,400.00                            $877,820.00                                                    $1,619,920.00

Alternate D    $253,872.00                                          $516,000.00                          $6,628,020.00                                                    $1,907,136.00

 

Engineer’s Estimate: Base Bid $2,985,995.00, Alternate A $359,000.00, Alternate B $584,880.00, Alternate C $2,084,00.00 and Alternate D $ 1,548,000.00.

 

Base Bid included Wastewater and Electrical Improvements for Loops A, F and G with Aluminum conductor and Coated Manholes.

• Alternate A is a product alternate bid for uncoated manholes with a microbiological additive.This ended up being a cost savings of $32,780 when compared to the Base Bid of coated manholes for  the amount of $316,300 and therefore, is recommended to be included.

• Alternate B is for the electrical improvements only for Loop B and is not recommended to be included as it would have exceeded the budgeted amount.

• Alternate C is a product alternate cost for the upgrade from aluminum conductor to copper conductor and is not recommended to be included as it would have exceeded the budgeted amount.

• Alternate D is for the addition of installing the cable in conduit in lieu of direct bury cabling and is recommended to be included due to long term maintenance and operations benefits.

 

These improvements provide for 5200 linear feet of 6" Wastewater Main, and Service connections for all pad sites in loops A, F and G; they also provide for Electrical system upgrades for Loops A, F & G including 20A, 30A and 50A, 120V receptacles at each Camp site. The proposed upgrades include replacing the existing transformers and distribution panels serving the campsites in order to accommodate increased load

 

Staff and project engineer, Freese and Nichols recommend that the Base bid in the amount of $2,337,167, Alternate A at a savings amount of -$32,780 and Alternate D in the amount of $253,872 for a total amount of $2,558,259 for this project be awarded to Gra-Tex Utilities.

 

Construction is anticipated to start in Late January 2020 with completion on or before May 20, 2020.

 

Financial Consideration

Funding in the total amount of $2,837,598 is available as follows:

1. $2,285,155 is available in Lake Capital Projects Fund 318793 WO #01917403 (Loyd Park Electric & SS)

2. $552,443 is available by approving an ordinance transferring and appropriating from the unobligated fund balance in the Lake Capital Projects Fund (318793) to WO #01917403 (Loyd Park Master Plan)

 

Body

AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS, AMENDING THE FY 2019/2020 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $552,443 FROM THE UNOBLIGATED FUND BALANCE IN THE LAKE CAPITAL PROJECTS FUND (318793) TO WO #01917403 (LOYD PARK MASTER PLAN); AND PROVIDING AN EFFECTIVE DATE

 

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS:

 

SECTION 1.  THAT THE FY 2019/2020 Capital Improvement Projects Budget by transferring and appropriating $552,443 from the unobligated fund balance in the Lake Capital Projects Fund (318793) to WO #01917403 (Loyd Park Master Plan)

 

SECTION 2.  THAT this Ordinance shall be and become effective immediately upon and after its passage and approval.

 

PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS, JANUARY 7, 2020.