File #: 16-6105    Version: 1 Name: IH20-Carrier Pkwy Ramp
Type: Ordinance Status: Adopted
File created: 9/27/2016 In control: Transportation
On agenda: 10/11/2016 Final action: 10/11/2016
Title: Ordinance amending the FY 2016/2017 Capital Improvement Projects Budget; and an Engineering consultant services contract with Halff Associates, Inc. in the maximum amount of $364,300 for the design of a ramp from SH 161 to IH 20 Eastbound Frontage road for Carrier Parkway
Attachments: 1. 01713401.pdf

From

Anda Upchurch

 

Title

Ordinance amending the FY 2016/2017 Capital Improvement Projects Budget; and an Engineering consultant services contract with Halff Associates, Inc. in the maximum amount of $364,300 for the design of a ramp from SH 161 to IH 20 Eastbound Frontage road for Carrier Parkway

 

Presenter

Walter Shumac, Director of Transportation Services

 

Recommended Action

Approve

 

Analysis

TxDOT is currently designing improvements to add frontage roads along IH 20 from Lake Ridge Parkway (SH 161) to Belt Line Road (FM 1382).  Under the plan being designed by TxDOT, the southbound SH 161 traffic desiring to go to Carrier Parkway at IH 20 must exit southbound SH 161 at Mayfield road, and use SH 161 southbound frontage road (Lake Ridge Parkway), then use the proposed IH 20 frontage road, traversing through traffic signals.

 

This contract provides for professional Engineering Services with Halff Associates, Inc. for the design of adding an exit ramp to Carrier Parkway from the existing direct connecting ramp from southbound SH 161 to eastbound IH 20.  The proposed additional ramp serving Carrier Parkway will require modification of the alignment of the previously approved proposed eastbound IH 20 frontage road bypass over Robinson Road.  The realignment of the bypass will not require additional right of way or easements. The scope also includes Reevaluation of the 2015 Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) original Environmental Categorical Exclusion (CE) for the original project prepared by TXDOT.

 

Financial Consideration

Funding for this work in the amount of $364,300 is available by approving an ordinance transferring and appropriating from the unobligated fund balance in the Street Capital Projects Fund (400192) to WO# 01713401 (IH20-Carrier Pkwy Ramp) 68560 (Eng/Con/Geo).

 

Body

AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS,

AMENDING THE FY 2016/2017 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $364,300 FROM THE UNOBLIGATED FUND BALANCE IN THE STREET CAPITAL PROJECTS FUND (400192) TO WO# 01713401 (IH20-CARRIER PKWY RAMP)

 

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS:

 

SECTION 1.  THAT THE FY 2016/2017 Capital Improvement Projects Budget be amended by transferring and appropriating $364,300 from the unobligated fund balance in the Street Capital Projects Fund (400192) to WO#01713401 (IH20-Carrier Pkwy Ramp) 68560 (Eng/Con/Geo)

 

 

PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS, ON THIS THE 11TH DAY OF OCTOBER, 2016.