Title: Ordinance amending the FY 2014/2015 Capital Improvements Projects Budget; Engineering and surveying services contract with KSA Engineers, Inc. for Waterwood Drive Extension from Arkansas Lane to north of Warrior Trail, for Drainage, Water and Wastewater Improvements in the total amount of $263,500
Attachments: 1. Warrior.pdf

From

max

 

Title

Ordinance amending the FY 2014/2015 Capital Improvements Projects Budget; Engineering and surveying services contract with KSA Engineers, Inc. for Waterwood Drive Extension from Arkansas Lane to north of Warrior Trail, for Drainage, Water and Wastewater Improvements in the total amount of $263,500

 

Presenter

Romin Khavari, City Engineer and Tom Cox, Deputy City Manager

 

Recommended Action

Approve

 

Analysis

This project provides for engineering and surveying services for the construction of approximately 3,000 linear feet of 24’ wide concrete pavement for Waterwood Drive Extension adjacent to the future Epic site from Arkansas Lane to north of Warrior Trail. This project is being coordinated with the design for the Epic and includes nine (9) parking lot and/or driveway connections and 8’-12’ sidewalks.

 

This project provides for the design of approximately 8,000 SY of concrete pavement, 2,400 L.F of various sized storm drain pipes with curb inlets, 6,200 L.F of 24”, 16”, 12” and 8” waterlines, 1,600 LF 12” wastewater line, Street lighting, electrical conduits, Entry signage, landscaping and irrigation.

 

In order to ensure a coordinated effort with the Epic Project, this project will be bid in conjunction with the Epic improvements.

     

Design of this project will be scheduled to begin in early September 2015 with projected completion in October 2015. Construction oversight services will follow.

 

Financial Consideration

Funding for engineering and surveying services contract with KSA Engineers, Inc. for Waterwood Drive Extension from Arkansas Lane to north of Warrior Trail, for Drainage, Water and Wastewater Improvements  in the amount of $263,500 is available by approving an ordinance transferring and appropriating from the unobligated fund balance in the Street Capital Projects Fund (400192) to WO #01513601-03 (Waterwood) 68560 (Eng/Con/Geo).  The Street Capital Projects Fund will be reimbursed from the November 2015 Bond Sale.  This is a temporary loan.

 

Body

AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS, AMENDING THE FY 2014/2015 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $263,500 FROM THE UNOBLIGATED FUND BALANCE IN THE STREET CAPITAL PROJECT FUND (400192) TO WO #01513601-03 (WATERWOOD).

 

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS:

 

SECTION 1.  THAT THE FY 2014/2015 Capital Improvements Project Budget be amended by transferring and appropriating $263,500 from the unobligated fund balance in the Street Capital Project Fund (400192) to WO #01513601-03 (Waterwood).

 

PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS, ON THIS THE 1ST DAY OF SEPTEMBER, 2015.