1.0 |
Concrete |
|
|
|
|
|
Price |
No Minimums |
|
1.01 |
Compression Test Cylinders (Making & Breaking), each |
$17.00 |
|
|
1.02 |
Air Content, Slump, Temperature, Unit Weight and Making Cylinders, (Per hour) |
$55.00 |
|
|
1.03 |
Next Day Cylinder pickup, (Per hour) |
$55.00 |
|
|
1.04 |
Vehicle charge, (Per Trip) |
$35.00 |
|
|
1.05 |
Flexural Beam Testing, each |
$32.50 |
|
|
1.06 |
4" Diameter Core, (Per inch of depth) |
$8.00 |
|
|
1.07 |
2" Diameter Core, (Per inch of Depth) |
$6.00 |
|
|
1.08 |
Core Thickness Measurement, (each) |
$9.75 |
|
|
1.09 |
Patching of Core Holes, each |
$11.00 |
|
|
1.10 |
Coring Technician Time, hour |
$52.75 |
|
|
1.11 |
Sawing and/or Capping Cores, each |
$16.00 |
|
|
1.12 |
Compression Test of Cores, each |
$22.00 |
|
|
1.13 |
Mix Design Review, each |
$152.40 |
|
|
1.14 |
Mix Design Formulation w/Aggregate Tests Include Specific Gravity/Sieve |
$800.00 |
|
|
|
Analysis/Unit WT-200, each |
|
|
|
1.15 |
Additional Mix Design Utilizing Above Mix Analysis, each |
$430.00 |
|
|
1.16 |
Mix Design Formulation Revision, each |
$250.00 |
|
|
1.17 |
Engineering Tech (NICET) for Quality Assurance Monitoring of Onsite |
$58.00 |
|
|
|
Work, hour |
|
|
|
1.18 |
Pre-pour Reinforcing Steel Placement Inspection, hour |
$58.00 |
|
|
1.19 |
Sampling for In-Lab Test, hour |
$58.00 |
|
|
1.20 |
Batching Mix Design in Preparation for Making Lab Confirmation Cylinders |
$170.00 |
|
|
|
or Beams, hour |
|
|
|
1.21 |
Batch Plant Observation Supporting Concrete Placement, hour |
$63.40 |
|
|
1.22 |
Concrete Flatness, (Up to 20,000 Sq. Ft.) |
Lump Sum |
|
|
1.23 |
Concrete Flatness, (Over 20,000 Sq. Ft. - per Sq. Ft.) |
$0.05 |
|
|
1.24 |
Certified Welding Inspector, hour |
$77.40 |
|
|
|
|
|
|
|
2.0 |
HMAC |
|
|
|
|
|
|
|
|
2.01 |
++Density Nuclear Method, (Per hour) |
$65.00 |
|
|
2.02 |
6" Diameter Core for in Place Density, (per inch of Depth) |
$11.30 |
|
|
2.03 |
Coring HMAC Technician Time, hour |
$60.60 |
|
|
2.04 |
Core Depth Measurement, core (each) |
$9.25 |
|
|
2.05 |
Patching Core Holes, each |
$10.00 |
|
|
2.06 |
Vehicle Charge (per Trip) |
$35.00 |
|
|
2.07 |
Ignition Oven Burn Off (% Bitumen and aggregate gradation), each |
$185.40 |
|
|
2.08 |
Lab Density, each |
$35.00 |
|
|
2.10 |
Stability Test, each |
$45.00 |
|
|
2.11 |
Maximum Specific Gravity, each |
$85.00 |
|
|
2.12 |
Batch Plant Hot Bin Analysis, hour |
$74.00 |
|
|
2.13 |
Material Sampling For In-lab Tests, hour |
$58.00 |
|
|
|
|
|
|
|
|
*** Includes Gauge Charge |
|
|
|
|
++ (includes Technician Time, and Gauge Charge). |
|
|
|
3.0 |
Professional |
|
|
|
|
|
|
|
|
3.01 |
Chief Engineer Scientist, hour |
$185.00 |
|
|
3.02 |
Senior Technician, hour |
$69.50 |
|
|
3.03 |
Senior Project Engineer Professional Engineer, hour |
$160.40 |
|
|
3.04 |
Project Engineer Scientist Geologist, hour |
$129.50 |
|
|
3.05 |
Graduate Engineer Project Manager, hour |
$111.00 |
|
|
3.06 |
Staff Scientist Geologist Engineer, hour |
$100.00 |
|
|
3.07 |
Clerical, hour |
$54.60 |
|
|
3.08 |
Drafter, hour |
$65.00 |
|
|
3.09 |
Engineering and Report Review, hour |
$136.00 |
|
|
4.00 |
Geotechnical |
|
|
|
|
|
|
|
|
4.01 |
Undisturbed Soil Sample, each |
$12.50 |
|
|
4.02 |
Visual Classification, each |
$12.50 |
|
|
4.03 |
Classification ASTM D-2487, each |
$105.00 |
|
|
4.05 |
Sample Preparation, hour |
$63.00 |
|
|
4.06 |
Atterburg Limits RAW PI, each |
$55.00 |
|
|
4.07 |
Soil w/Additive, each |
$65.00 |
|
|
4.08 |
Bar Lineal Shrinkage, each |
$46.00 |
|
|
4.09 |
Moisture Density Relationship (Proctor) Standard (ASTM D-698), each |
$185.00 |
|
|
4.10 |
Moisture Density Relationship (Proctor) Modified (ASTM D-1557),each |
$220.00 |
|
|
4.11 |
THD 113E, each |
$220.00 |
|
|
4.12 |
Unit Weight, each |
$32.50 |
|
|
4.13 |
Unit Weight (Dry Rodded), each |
$35.00 |
|
|
4.14 |
-200 Sieve Analysis, each Decant |
$42.00 |
|
|
4.15 |
Laboratory Moisture Content, each |
$8.40 |
|
|
4.16 |
Sieve Analysis (Fine Aggregate), each |
$84.00 |
|
|
4.17 |
Sieve Analysis (Large Aggregate), each |
$84.00 |
|
|
4.18 |
Sieve Analysis (Finer than 200 Sieve), each (Hydrometer Analysis) |
$115.00 |
|
|
4.19 |
Lime or Cement Series Determination (5 points) |
$315.00 |
|
|
4.20 |
pH Series (6 points), each |
$248.70 |
|
|
4.21 |
Sulphate Test (TEX 145E), each (5 days turnaround) |
$69.00 |
|
|
4.22 |
Sulphate Test (TEX 145E), each (48 hour turnaround) |
$134.00 |
|
|
4.23 |
Specific Gravity, each (Aggregate) |
$63.00 |
|
|
4.24 |
Absorption, each |
$35.00 |
|
|
4.25 |
Los Angeles Abrasion (Large Aggregate), each |
$235.00 |
|
|
4.26 |
Los Angeles Abrasion (Small Aggregate), each |
$235.00 |
|
|
4.27 |
Texas Wet Ball Mill, each |
$250.00 |
|
|
4.28 |
Gradation (Lime or Cement Stabilized), hour |
$58.00 |
|
|
4.29 |
*** Limed Soil Depth Measurement, hour |
$58.00 |
|
|
4.30 |
++ In Place Moisture Density, (per Hour) (Tech & Gauge) |
$70.00 |
|
|
4.31 |
Unconfined Compression Test Soil, each (Including Moisture) |
$50.00 |
|
|
4.32 |
Unconfined Compression Test Rock, each (Including Moisture) |
$60.00 |
|
|
4.33 |
Confined Compressions Test (UU), each |
$129.00 |
|
|
4.34 |
Triaxial Consolidated Undrained w/Pore Pressure Measurement, speci (3 Stage) |
$1,300.00 |
|
|
4.35 |
Triaxial Consolidated Drained, per stage |
$950.00 |
|
|
4.36 |
Consolidated Test, each |
$500.00 |
|
|
4.37 |
Direct Shear Consolidated Drained Sand & Gravel, point |
$232.00 |
|
|
4.38 |
Direct Shear Consolidated Drained Silt & Clay, point |
$232.00 |
|
|
4.39 |
California Bearing Ratio, each |
$416.70 |
|
|
4.40 |
THD Triaxial, each |
$1,600.00 |
|
|
4.41 |
Swell, each Absorption Pressure |
$140.00 |
|
|
4.42 |
Permeability Test Falling Head, each |
$400.00 |
|
|
4.43 |
Permeability Test Tiraxial, each |
$525.00 |
|
|
4.44 |
Permeability Test Flex Wall, each |
$525.00 |
|
|
4.45 |
Permeability Test Granular Soils, each (Constant Head) |
$400.00 |
|
|
4.46 |
Permeability Test Pressure Head w/Back Pressure Saturation, each |
$515.00 |
|
|
4.47 |
Electrical Resistivity, THD Method, each |
$166.70 |
|
|
4.48 |
Truck Mounted Mobilization, mile |
$4.00 |
|
|
4.49 |
Truck Mounted Mobilization, trip |
$371.70 |
|
|
4.50 |
Buggy/Ave Mounted, mile |
$5.50 |
|
|
4.51 |
Buggy/Ave Mounted, trip |
$613.40 |
|
|
4.52 |
Site Access Clearing (including disposal and revegetation) Lump Sum (**QOR) |
Quote on Request |
|
|
4.53 |
Per Diem Per Man, (per day as per State Per Diem Rate Standard) |
Quote on Request |
|
|
4.54 |
Intermittent Soil Sampling w/Truck @ 5' Intervals 0-25' Depth, foot |
$14.40 |
|
|
4.55 |
Intermittent Soil Sampling w/Truck @ 5' Intervals 25-50' Depth, foot |
$16.90 |
|
|
4.56 |
Intermittent Soil Sampling w/Truck @ 5' Intervals 50-100' Depth, foot |
$19.50 |
|
|
4.57 |
Continuous Soil Sampling w/Truck 0-10' Depth, foot |
$17.50 |
|
|
4.58 |
Intermittent Soil Sampling w/ATV @ 5' Intervals 0-25' Depth, foot |
$18.00 |
|
|
4.59 |
Intermittent Soil Sampling w/ATV @ 5' Intervals 25-50' Depth, foot |
$20.40 |
|
|
4.60 |
Intermittent Soil Sampling w/ATV @ 5' Intervals 50-100' Depth, foot |
$23.90 |
|
|
4.61 |
Continuous Soil Sampling w/ATV 0-10' Depth, foot |
$21.00 |
|
|
4.62 |
Continuous Soil Sampling w/ATV 10-50' Depth, foot |
$33.40 |
|
|
4.63 |
Auger Drilling Without Sample, foot |
$10.70 |
|
|
4.64 |
Rock Coring w/NX Size, Core Barrel 0-25' Depth Carbide Bit, foot |
$27.50 |
|
|
4.65 |
Rock Coring w/NX Size, Core Barrel 25-50' Depth Carbide Bit, foot |
$29.50 |
|
|
4.66 |
Rock Coring w/NX Size, Core Barrel 50-75' Depth Carbide Bit, foot |
$30.50 |
|
|
4.67 |
Rock Coring w/NX Size, Core Barrel 75-100' Depth Carbide Bit, foot |
$32.00 |
|
|
4.68 |
Rock Coring w/NX Size, Core Barrel 50-75' Depth Diamond Bit, foot |
$37.20 |
|
|
4.69 |
CME 5' Continuous Sampler 0-50' Depth, run |
$22.00 |
|
|
4.70 |
Stand By or Access Time, hour |
$200.00 |
|
|
4.71 |
Drilling w/Auger Rig, hour |
$225.00 |
|
|
4.72 |
Minimum Drill Fee |
$800.00 |
|
|
4.73 |
Post Injection Sub-grade Evaluation Per Boring Including Moisture and |
$650.00 |
|
|
|
Free Swell Determination |
|
|
|
4.74 |
Minimum Post Injection Charge |
$1,500.00 |
|
|
4.75 |
Vehicle Charge (Per Trip) |
$35.00 |
|
|
|
|
|
|
|
|
*** Includes Gauge Charge |
|
|
|
|
++ (includes Technician time and Gauge Charge) |
|
|