File #: 17-6536    Version: 1 Name: Engineering and surveying services contract with Salcedo Group Inc. (SGI) for Acosta Paving Drainage, and Utility Improvements from E. Cober Drive to Nunez Drive
Type: Agenda Item Status: Consent Agenda
File created: 2/23/2017 In control: Engineering
On agenda: 3/7/2017 Final action: 3/7/2017
Title: Engineering and surveying services contract with Salcedo Group Inc. (SGI) for Acosta Paving Drainage, and Utility Improvements from E. Cober Drive to Nunez Drive in the total amount of $108,220 with a 5% contingency of $5,411 for a total project cost of $113,631
Attachments: 1. 617.78 Acosta.pdf

From

Craig Alexander

 

Title

Engineering and surveying services contract with Salcedo Group Inc. (SGI) for Acosta Paving Drainage, and Utility Improvements from E. Cober Drive to Nunez Drive in the total amount of $108,220 with a 5% contingency of $5,411 for a total project cost of $113,631

 

Presenter

Romin Khavari, City Engineer

 

Recommended Action

Approve

 

Analysis

As part of the FY 2016/2017 CIP, funds were approved for the design of water, wastewater, drainage and paving improvements of Acosta Dr. from E. Cober to Nunez Drive.

 

This project provides for engineering and surveying services for the reconstruction of 1,100 linear feet of 22-foot wide existing asphalt pavement street to a 27-foot wide concrete pavement street and the addition of 5-foot wide sidewalks (none are currently present).  It will also provide for the replacement of 279 linear feet of existing 6” wastewater main with 8” PVC wastewater main, replacement of 255 linear feet of existing 6”and 8” water main with 8” PVC water main, and other miscellaneous related improvements. This project also provides for the addition of storm drain infrastructure along Acosta Street, as bar ditches are currently in place for the conveyance of storm water runoff in the area.  In total, approximately 1,544 linear feet of storm drain pipe from 18 inches to 42 inches in diameter and 26 storm drain inlets will be constructed as part of this project.

 

Design of this project will be scheduled to begin in March 2017 with anticipated completion in May 2017.

 

Financial Consideration

Funding for the engineering and surveying services contract with Salcedo Group Inc. (SGI) for Acosta Paving Drainage, and Utility Improvements from E. Cober Drive to Nunez Drive in the total amount of $108,220 with a 5% contingency of $5,411 for a total project cost of $113,631 is available in the Street Capital Projects Fund (400192) WO #01707803 (Acosta-Cober to Kennedy Middle School)