Ordinance Amending the FY 2015/2016 Capital Improvement Projects Budget; and Construction contract with ACE Pipe Cleaning, Inc. in the amount of $753,163.50 for Miscellaneous Wastewater Replacements at various locations throughout the city; Material testing with Team Consultants in the amount of $12,358; 5% contract contingency in the amount of $37,658; In-house labor distribution in the amount of $37,658, for a total project cost of $840,837.50.
Presenter
Ron McCuller, Director of Public Works and Romin Khavari, City Engineer
Recommended Action
Approve
Analysis
As part of the City’s ongoing Capital Improvements Program, wastewater locations in decaying condition are recommended for replacement by the Water Utilities staff on a yearly basis. City staff has prepared plans and specifications to replace old, decaying wastewater mains in various locations throughout the city with new wastewater mains. For this design package, a total of three (3) locations were identified, and include the following wastewater improvements:
· Replacement of 1,319 linear feet of wastewater main with 8” PVC wastewater main by open cut, replacement of 602 linear feet of wastewater main with 8” wastewater main by cured-in-place pipe (CIPP) method, and replacement of 65 linear feet of wastewater main with 8” wastewater main by pipe bursting along Tarrant Road between Stadium Drive and Interstate 30.
· Replacement of 2,145 linear feet of wastewater main with 8” PVC wastewater main by open cut along Galveston Street between W. Jefferson Street and SW 19th Street.
· Replacement of 317 linear feet of wastewater main with 8” PVC wastewater main by open cut along Marshall Drive east of the intersection of S. Belt Line Road and Marshall Drive.
This project includes approximately 4,448 LF of 8” wastewater pipe replacement, 1,620 LF of 4” wastewater pipe replacement, 64 wastewater service re-connections, 12 new wastewater manholes, 102 vertical feet of wastewater manh...