File #: 15-4575    Version: 1 Name: Change Order/Amendment No. 2 to the construction contract with GHB Equipment Co. in the amount of -$2,546.20 for Central Park Pedestrian Bridges
Type: Agenda Item Status: Consent Agenda
File created: 4/10/2015 In control: Engineering
On agenda: 4/21/2015 Final action: 4/21/2015
Title: Change Order/Amendment No.2 to the construction contract with GHB Equipment Co. in the amount of -$2,546.20 for Central Park Pedestrian Bridges
From
max

Title
Change Order/Amendment No.2 to the construction contract with GHB Equipment Co. in the amount of -$2,546.20 for Central Park Pedestrian Bridges

Presenter
Romin Khavari, City Engineer

Recommended Action
Approve

Analysis
On November 4, 2015 the City of Grand Prairie awarded a contract to GHB Equipment to include repair of two (2) existing pedestrian bridges in front of The Summit due to soil movement, to include construction of four (4) new bridge abutments and wing walls (two (2) per pedestrian bridge), construction of eight (8) 24-inch vertical drilled shafts with an approximate depth of 67 vertical feet per drilled shaft (two (2) drilled shafts per abutment), removal and re-installation of both pedestrian bridges, demolition and removal of the four (4) existing pedestrian bridge abutments, removal and replacement of approximately 125 square yards of sidewalk, 425 cubic yards of rock rip rap installation, and miscellaneous related items of work.

Change Order No. 1 was a time extension only.

The Current Change Order No. 2 provides for a quantity underrun on the 24-inch drilled shafts at the new pedestrian bridge abutments, from 536 vertical feet in the contract documents to 393 vertical feet actually constructed in the field which resulted in a savings of $35,750 from the original contract amount. The current change order/Amendment No. 2 provides for recovery of some cost of the 24-inch drilled shafts bid item due to the quantity underrun exceeding 25% of the quantity listed in the bid documents, as the contractor had ordered materials and other miscellaneous items for this item of work based upon the quantity listed in the bid documents. This change order also provides for electrical work for relocation and repair of electrical lines around the old and new pedestrian bridge abutments; the filling of a sizeable gap between the sidewalk and parking lot with a flexible sealant; the construction of a 4-inch tall doweled curb to direct ...