Title
Professional engineering and surveying services contract with Salcedo Group Inc. (SGI) for Capetown from Denmark to Sweden Paving, Drainage, and Wastewater Improvements in the total amount of $180,100
Presenter
Romin Khavari, City Engineer
Recommended Action
Approve
Analysis
This project provides for engineering and surveying services for the reconstruction of 3,960 linear feet of 27' wide concrete pavement, including 4' wide sidewalks in Capetown Dr. between Sweden Dr. and Denmark Dr.; it will also provide for the replacement of 3,781 linear feet of existing 6" wastewater main with 8" PVC wastewater main, installation of 150 linear feet of 18"-24" RCP storm drain laterals, approximately eight 10' wide recessed storm drain curb inlets, and other miscellaneous improvements. This project also provides for upgrading the existing storm drain infrastructure along Tripoli Trail from Paris Drive to Capetown Drive by removing and replacing 486 linear feet of existing storm drain pipe. The improvements along Tripoli Trail were identified in the Storm Water Master Plan study as an area needing improvement to adequately convey the flows from larger storm events and prevent minor flooding in the area.
Design of this project will be scheduled to begin in May 2015 with anticipated completion in October 2015.
Financial Consideration
Funding in the amount of $181,100 is available as follows:
1. $154,697.78 is available in Streets Capital Projects Fund (400192) WO #01506603 (Capetown from Denmark to Sweden) 68560 (Engineering/Geotech).
2. $25,402.22 is available in Wastewater Capital Projects Fund (500692) WO #01510201 (Capetown from Denmark to Sweden) 68560 (Engineering/Geotech).