File #: 17-6567    Version: 1 Name: Duncan Perry Bridge Rehabilitation Engineering Contract to Cobb, Fendley & Associates in the amount of $89,500 plus a 5% Contingency of $4,475 for a total of $93,975
Type: Agenda Item Status: Consent Agenda
File created: 2/24/2017 In control: Public Works
On agenda: 3/7/2017 Final action: 3/7/2017
Title: Contract with Cobb, Fendley & Associates Duncan Perry Bridge Rehabilitation Engineering in the amount of $89,500 plus a 5% Contingency of $4,475 for a total of $93,975
Attachments: 1. 616.59 Duncan Perry Brdg.pdf

From

Ron McCuller

 

Title

Contract with Cobb, Fendley & Associates Duncan Perry Bridge Rehabilitation Engineering in the amount of $89,500 plus a 5% Contingency of $4,475 for a total of $93,975

 

Presenter

Ron McCuller, Public Works Director

 

Recommended Action

Approve

 

Analysis

Cobb Fendley Engineers have previously evaluated the Duncan Perry Bridge and determined that it cannot be rehabilitated to meet current design standards.  However, they did identify certain repairs and improvements that should be undertaken until the bridge can be replaced. This bridge was constructed in 1939 and is currently over 70 years old.  We have plans to replace this bridge at a later date, hoping to utilize funding assistance from the State since the bridge is eligible for State assistance due to its' age and structural condition. We are applying for this program but are advised that funding could take several years.


Therefore, we proposed to award a design contract to Cobb, Fendley & Associates to provide the needed engineering work for needed rehabilitation and repairs to the bridge in order to be sure to maintain its' current load rating of 40,000 pounds.  Most of this work will be under the bridge in the channel and cause minimal traffic disruption.

 

Financial Consideration

Funding for the Duncan Perry Bridge Rehabilitation Engineering Contract to Cobb, Fendley & Associates in the amount of $89,500 plus a 5% Contingency of $4,475 for a total of $93,975 is available in  the Street Capital Projects Fund (400192) WO #01605903 (Duncan Perry Bridge) 68560 (Eng/Con/Geo)