File #: 15-4774    Version: 1 Name: Ordinance; Construction contract for Main Street Sidewalks
Type: Ordinance Status: Adopted
File created: 7/1/2015 In control: Engineering
On agenda: 8/4/2015 Final action: 8/4/2015
Title: Ordinance amending the FY 2014/2015 Capital Improvement Projects Budget; Construction contract with C. Green Scaping, Inc. in the amount of $821,770 for Main Street Sidewalk, Landscaping, and Hardscaping Improvements from Municipal Court to Annex and Main Street Sidewalk, Landscaping, and Hardscaping Improvements from Center Street to NW 2nd Street; Material testing with TEAM Consultants, Inc. in the amount of $8,515.50; 5% contract contingency in the amount of $41,088.50; In-house labor distribution in the amount of $41,088.50 for a total project cost of $912,462.50
Attachments: 1. CPBS 614.65.pdf, 2. Recommendation Letter.pdf
From
max

Title
Ordinance amending the FY 2014/2015 Capital Improvement Projects Budget; Construction contract with C. Green Scaping, Inc. in the amount of $821,770 for Main Street Sidewalk, Landscaping, and Hardscaping Improvements from Municipal Court to Annex and Main Street Sidewalk, Landscaping, and Hardscaping Improvements from Center Street to NW 2nd Street; Material testing with TEAM Consultants, Inc. in the amount of $8,515.50; 5% contract contingency in the amount of $41,088.50; In-house labor distribution in the amount of $41,088.50 for a total project cost of $912,462.50

Presenter
Bill Crolley, Executive Director of Planning and Development and Romin Khavari, City Engineer

Recommended Action
Approve

Analysis
KSA Engineers, Inc. was hired to design sidewalk, landscaping, and hardscaping improvements to the downtown area of the City, specifically the blocks on the North and south side of W. Main St. from Center St. to N. W. 2nd Street and the Southwest corner of Main Street and N.W. 2nd Street.

These projects include the removal and replacement of the concrete sidewalks, storm drain improvements, parking improvements which include changing the parking spaces from angled parking to parallel parking, and landscaping and irrigation improvements as part of the streetscaping. These improvements were split into two separate bid packages in order to minimize the impact on the downtown businesses and citizens.

A portion of this project was originally bid on November 25, 2013, and awarded to Macval Associates. However, due to numerous delays in starting construction, insufficient progress and inability to perform per plans and specification, Staff found it necessary to reach a mutual agreement with Macval Associates to dissolve their construction contract. All disturbed and unfinished work at the southwest corner of Center Street and Main Street was successfully completed by City personnel and its on-call contractors. The remaining uncompleted ...