Skip to main content
File #: 16-5479    Version: 1 Name: Design Creek Encasement
Type: Agenda Item Status: Consent Agenda
File created: 3/8/2016 In control: Airport
On agenda: 3/22/2016 Final action: 3/22/2016
Title: Award Engineering/Design Contract with KSA Engineers for reconstruction of Taxiway B on the west side of Grand Prairie Municipal Airport, in the amount of $71,200
Attachments: 1. 16-5479 - North Side Drainage and Taxiway Culvert Replacement.pdf, 2. 16-5479 Airport Capital Projects Budget Summary

From

Jan Hill

 

Title

Award Engineering/Design Contract with KSA Engineers for reconstruction of Taxiway B on the west side of Grand Prairie Municipal Airport, in the amount of $71,200

 

Presenter

Randy J. Byers, C.M., Airport Director

 

Recommended Action

Approve

 

Analysis

Taxiway B extends from the main runway to Airbus Helicopters, Inc. located on the west side of the airport.  Airbus Helicopters, Inc. operates under an FAA approved Through-the-Fence agreement.  The taxiway runs above and across a corrugated steel drainage pipe.  The subgrade and surrounding area have begun to fail due to erosion.   Action is urgently needed to plan and execute repairs in order prevent failure of the taxiway.

 

KSA Engineers is familiar with both the failure and the condition of the current facilities at Grand Prairie Municipal Airport.  They were asked to provide a proposal on how to accomplish repairs and study ways to prevent future failures in the area.  They have provided a proposal to do the study, design and prepare bid documents at a total cost of $71,200.

 

Financial Consideration

Funding for the Engineering/Design Contract with KSA Engineers for reconstruction of Taxiway B on the west side, in the amount of $71,200 is available in the Airport Capital Projects Fund (505292) WO #01600201 (Design North Creek Encasement).