Skip to main content
File #: 12-2168    Version: 1 Name: Consultant design contract with Halff Associates in the total amount of $196,310 for the Miscellaneous Public Erosion at Cedar Creek and Prairie Creek and Wastewater Crossing protection, a 5% contingency in the amount of $9,815, City Engineering Administ
Type: Agenda Item Status: Consent Agenda
File created: 10/8/2012 In control: Engineering
On agenda: 11/6/2012 Final action: 11/6/2012
Title: Consultant design contract with Halff Associates in the total amount of $198,380 for the Miscellaneous Public Erosion at Cedar Creek and Prairie Creek and Wastewater Crossing protection; City Engineering Administration in the amount of $9,919; a 5% contingency in the amount of $9,919, for the total project amount of $218,218
Attachments: 1. FIS 01204801.pdf, 2. FIS 01208101.pdf
From
max
Title
Consultant design contract with Halff Associates in the total amount of $198,380 for the Miscellaneous Public Erosion at Cedar Creek and Prairie Creek and Wastewater Crossing protection; City Engineering Administration in the amount of $9,919; a 5% contingency in the amount of $9,919,  for the total project amount of $218,218
 
Presenter
Ron McCuller, Director of Public Works, Romin Khavari, City Engineer and Gabriel Johnson, Stormwater Utility Manager
 
Recommended Action
Approve
 
Analysis
As part of the Cedar Creek and Prairie Creek Drainage Master Plans, erosion studies were performed making recommendations for improvements to provide public benefit by keeping the creek in check by providing armoring for the creek with rock rip-rap or other means designed to keep the creek from eroding at critical points. The Cedar Creek Study also identified 5 sanitary sewer crossings that need to be improved to keep them from eroding, included as part of this project.
 
The City has requested Proposal from Halff Associates to perform the design for this work. The total cost for this work is $198,380 to include surveying, design , bidding and construction services.
 
The design work is scheduled to  be completed by March 2013 with construction services to follow.
 
Financial Consideration
Funding in the amount of $218,218 is available as follows:
 
1. $127,819 is available in Storm Capital Project Fund (401592) WO#01204801 (FY 12 Misc Public Erosion)
2. $90,399 is available in Wastewater Capital Project Fund (500692) WO#1208101 (WWST Cedar Creek Crossing Prtc)