Legislation Details

File #: 20-10301    Version: 1 Name: Ordinance; Construction contract with La Banda, LLC for Dickey Road Storm Drain Improvements West of SW 3rd Street
Type: Ordinance Status: Adopted
File created: 8/20/2020 In control: Engineering
On agenda: 9/1/2020 Final action: 9/1/2020
Title: Ordinance amending the FY 2019/2020 Capital Improvement Projects Budget; Construction contract with La Banda, LLC for Dickey Road Storm Drain Improvements West of S.W. 3rd Street in the total amount of $2,139,761; material testing with Team Consultants in the amount of $53,494; in-house engineering in the amount of $106,988; and 5% construction contract contingency in the amount of $106,988 for a total project cost of $2,407,231
Attachments: 1. 4226-19.063_2020-08-19_Letter of Recommendation.pdf, 2. WO 619.64.pdf, 3. WO 619.175 WTER.pdf, 4. WO 619.176 WWST.pdf
From
Max

Title
Ordinance amending the FY 2019/2020 Capital Improvement Projects Budget; Construction contract with La Banda, LLC for Dickey Road Storm Drain Improvements West of S.W. 3rd Street in the total amount of $2,139,761; material testing with Team Consultants in the amount of $53,494; in-house engineering in the amount of $106,988; and 5% construction contract contingency in the amount of $106,988 for a total project cost of $2,407,231

Presenter
Gabe Johnson, Director of Public Works and Romin Khavari, City Engineer

Recommended Action
Approve

Analysis
On Tuesday, August 18, 2020, the City of Grand Prairie opened bids for Dickey Road Storm Drain Improvements West of S.W. 3rd Street. The low bidder is La Banda, LLC in the total bid amount of $2,139,761.00.

This project was identified as part of the FY19 Capital Projects Budget and Capital Projects Plan for proposed drainage improvements extending from SW 3rd Street to Indian Hills Drive. During the design process it was determined that the existing water and wastewater mains were old and that it was prudent to replace the water main (from SW 3rd Street to Shawnee Trace) and wastewater mains (from Dawson Circle to Ralph Street and at street crossings to connect to existing mains) in conjunction with the storm drain improvement project. The Dickey Road Storm Drain Improvements West of S.W. 3rd Street, project provides for underground storm drainage, water and wastewater improvements to replace old water and wastewater lines in Dickey Road and provides a 100-year storm capacity storm drainage system in Dickey Road between SW 3rd Street and Indian Hills Drive.

The Dickey Road Storm Drain Improvements West of S.W. 3rd Street project is part of the City-Wide Master Drainage Plan for storm drainage improvements in the Indian Hills area of the City.
This project provides for installation 1500 linear feet of 36-inch diameter reinforced concrete pipe, 2450 linear feet of 8-inch diameter water main pi...