File #: 17-7364    Version: 1 Name: Ordinance; Construction Contract for Palace Parkway from Belt Line Road to I-30 Access Road
Type: Ordinance Status: Adopted
File created: 11/10/2017 In control: Engineering
On agenda: 12/12/2017 Final action: 12/12/2017
Title: Ordinance amending the FY 2017/2018 Capital Improvement Projects Budget; Construction Contract with McMahon Contracting in the total negotiated amount of $4,616,251.41 for Palace Parkway from Belt Line Road to IH-30 Access Road; Material testing with Reed Engineering in the amount of $86,605; 5% contract contingency in the amount of $230,813; In-house engineering in the amount of $115,406; Street Lighting allowance of $35,000; Signal/Fiber allowance of $40,000 for a total project cost of $5,124,075.41
Attachments: 1. L 2017-11-29 Recommendation.pdf, 2. 590.36.pdf, 3. 617.105.pdf, 4. 617.118.pdf
From
max

Title
Ordinance amending the FY 2017/2018 Capital Improvement Projects Budget; Construction Contract with McMahon Contracting in the total negotiated amount of $4,616,251.41 for Palace Parkway from Belt Line Road to IH-30 Access Road; Material testing with Reed Engineering in the amount of $86,605; 5% contract contingency in the amount of $230,813; In-house engineering in the amount of $115,406; Street Lighting allowance of $35,000; Signal/Fiber allowance of $40,000 for a total project cost of $5,124,075.41

Presenter
Romin Khavari, City Engineer; Ron McCuller, Director of Public Works; Walter Shumac, Director of Transportation, and Steve Norwood, Director of Planning and Development.

Recommended Action
Approve

Analysis
Based on Developer interest in this area, and the willingness to dedicated the needed right-of-way and easements for the project, on September 19, 2017, City of Grand Prairie City Council awarded a professional engineering contract to Halff Associates, Inc. to update the 2010 project plans to current standards, including bidding and construction services associated with paving, drainage and utility improvements for Palace Parkway from Beltline Road East to IH-30 Frontage Road. The Right-of-way and easements are currently being finalized for dedication to the City.

The project improvements provide for furnishing all labor, material, equipment and performing all work required for the Palace Parkway Paving, Drainage, Water & Wastewater Improvements, consisting of approximately 2,371 feet of linear 4-lane roadway construction, 2,665 linear feet of water line, 2,780 linear feet of wastewater main, construction of a 203-foot 2-barrel 12’x12’ box culvert with headwalls, storm drain pipes, traffic signal adjustments at Belt line Road and other miscellaneous items of work.

This project was bid using the competitive sealed proposal method. On November 14, 2017, the City of Grand Prairie publicly opened eight proposals for this projec...

Click here for full text