Skip to main content
File #: 16-5511    Version: 1 Name: Construction contract with McMahon Contracting, Inc. for Capetown Paving, Drainage, & Wastewater Improvements
Type: Ordinance Status: Adopted
File created: 3/25/2016 In control: Engineering
On agenda: 4/5/2016 Final action: 4/5/2016
Title: Ordinance amending the FY 2015/2016 Capital Improvement Projects Budget; construction contract with McMahon Contracting, Inc. in the amount of $3,018,611.49 for Capetown Paving, Drainage, and Wastewater Improvements; material testing with Team Consultants in the amount of $36,681; in-house labor distribution in the amount of $90,558; 5% contingency in the amount of $150,930; for a total project cost of $3,296,780.49
Attachments: 1. 616.42.pdf, 2. 615.pdf, 3. 615.pdf
From
Craig Alexander

Title
Ordinance amending the FY 2015/2016 Capital Improvement Projects Budget; construction contract with McMahon Contracting, Inc. in the amount of $3,018,611.49 for Capetown Paving, Drainage, and Wastewater Improvements; material testing with Team Consultants in the amount of $36,681; in-house labor distribution in the amount of $90,558; 5% contingency in the amount of $150,930; for a total project cost of $3,296,780.49

Presenter
Ron McCuller, Director of Public Works and Romin Khavari, City Engineer

Recommended Action
Approve

Analysis
As part of the City’s ongoing Capital Improvements Program, Salcedo Group, Inc. was hired to design improvements for the pavement, drainage system, and wastewater system for Capetown Drive between Denmark Drive and Sweden Drive. The contract with Salcedo Group was later modified to include the design of wastewater improvements along Tripoli Trail from the intersection with Capetown Drive north to the intersection with Tarrant Road so that the streets department may proceed to re-build the Tripoli Trail roadway at a future date as part of the City’s street maintenance program funded by sales tax revenues.

This project includes the complete replacement of the concrete pavement along Capetown Drive, the rehabilitation or replacement of the wastewater line located under the Capetown Drive pavement, the replacement of the wastewater line located under the Tripoli Trail pavement, and drainage improvements along Capetown Drive and also along Tripoli Trail from Capetown Drive north to Juneau Drive.

The City of Grand Prairie advertised and received two (2) proposals for this project on Thursday, March 3, 2016:

McMahon Contracting Total Bid: $3,274,890.02
Tiseo Paving Total Bid: $5,586,097.20

This project was bid using the competitive sealed proposals method, which allows the City to select a contractor based upon the best value for the City based upon the ranking criteria specified in the bid...

Click here for full text