Ordinance amending the FY 2012/2013 Capital Improvements Project Budget; and a construction contract with Humphrey & Morton Construction Company, Inc. in the amount of $621,641.30 for Cedar Creek Culvert Improvements at Robinson Road and Prairie Lane; material testing of $16,610; in house engineering of $31,082, and a 5% contingency of $31,082 for a total project cost of $700,415.30
Presenter
Ron McCuller, Director of Public Works and Romin Khavari, City Engineer
Recommended Action
Approve
Analysis
On Tuesday, January 15, 2013, the City of Grand Prairie opened bids for the Cedar Creek Culvert Improvements project. The low bidder for this project was Humphrey & Morton Construction Company, Inc. with a base bid of $571,993.70 and an added alternate bid of $621,640.30. The base bid for this project allowed for the complete removal of the existing four 8-foot by 4-foot reinforced concrete box culverts along Prairie Drive at the intersection of Cedar Creek and the installation of four 8-foot by 5-foot reinforced concrete box culverts. The base bid also allowed for a removal of a portion of the existing culvert structure to include height adjustment of the existing four reinforced concrete box culverts along Robinson Road at the intersection of Cedar Creek, from 9-foot by 5-foot, to a new height of 9-feet by 8-feet. The base bid allows for the complete pavement removal and replacement at both intersections. This pavement removal and replacement will not change the elevation of the road surface at either location. Finally, the base bid allows for the relocation of an existing 12-inch water main running adjacent to Robinson Road at the intersection of Cedar Creek in order to avoid a conflict with the 12-inch water main and the raising of the reinforced concrete box culverts at this intersection.
The added alternate for this project provides for the same items under the base bid with the exception of the complete removal of the four existin...
Click here for full text