File #: 17-7263    Version: 1 Name: c/o 9 w/Lee Lewis Construction for modifications at the EPIC site
Type: Ordinance Status: Adopted
File created: 10/6/2017 In control: Engineering
On agenda: 10/17/2017 Final action: 10/17/2017
Title: Change Order/Amendment No. 9 with Lee Lewis Construction, Inc. in the amount of -$120,918 for alcoves for moveable basketball goals, aquatics revisions and additions, lightning protection savings, sanitary sewer elevation resolution, wave pool capacity control provisions, mechanical and electrical savings, sanitary sewer bore under communication vault, natural gas piping installation, electrical service #5 provisions, power provisions to amphitheater, corrected percentage for construction cost overhead amount on previously executed change orders, damproofing at Grand Central trail restroom building, glazing revisions, library kiosk allowance credit and addition of necessary interior and exterior power locations for operational needs
Attachments: 1. 17-7263 STRT, 2. 17-7263 Water, 3. 17-7263 WWST
From
Andy Henning

Title
Change Order/Amendment No. 9 with Lee Lewis Construction, Inc. in the amount of -$120,918 for alcoves for moveable basketball goals, aquatics revisions and additions, lightning protection savings, sanitary sewer elevation resolution, wave pool capacity control provisions, mechanical and electrical savings, sanitary sewer bore under communication vault, natural gas piping installation, electrical service #5 provisions, power provisions to amphitheater, corrected percentage for construction cost overhead amount on previously executed change orders, damproofing at Grand Central trail restroom building, glazing revisions, library kiosk allowance credit and addition of necessary interior and exterior power locations for operational needs

Presenter
Tom Cox, Deputy City Manager

Recommended Action
Approve

Analysis
On December 9, 2014 the City Council awarded the Construction Manager at Risk (CMAR) contract to Lee Lewis Construction, Inc. for pre-construction services in the amount of $20,000. This award provided the CMAR services including development of project estimates, preliminary construction schedules, value engineering and constructability review during the Design Phase.

The current Change Order/Amendment No. 9 in the amount of -$120,918 is divided as follows:
1. $6,814 for seating alcove provisions to coordinate with selected moveable basketball goals
2. $119,513 for aquatics design coordination with finalized water feature requirements
3. -$15,201 for lightning protection design changes
4. $16,821 for sanitary sewer conflict with existing conditions
5. $4,930 for wavepool capacity control ropes and floats
6. -$997 for mechanical and electrical savings associated with lighting coordination adjustments
7. $19,213 for sanitary sewer bore below existing communications vault
8. $74,395 for Atmos natural gas line installation
9. $10,287 for Oncor electric service #5 to PlayGrand Adventures
10. $64,400 for electrical power prov...