File #: 14-3987    Version: 1 Name: Freetown III construction
Type: Agenda Item Status: Consent Agenda
File created: 8/20/2014 In control: Engineering
On agenda: 9/2/2014 Final action: 9/2/2014
Title: Construction contract with the apparent low bidder, McMahon Contracting, L.P. in the bid amount of $1,829,281.13 for Freetown Road Phase III from Carrier Parkway and SW 3rd St; material testing in the amount of $19,274 with Alliance Geotechnical Group; in-house engineering in amount of $91,465; a 5% contingency in the amount of $91,465, and $10,000 for street lighting provided by Oncor, for a total requested project cost amount of $2,041,485.13
Attachments: 1. FIS 01406203, 2. FIS 01409603, 3. 2014 08 14 Recmd of Award
Title
Construction contract with the apparent low bidder, McMahon Contracting, L.P. in the bid amount of $1,829,281.13 for Freetown Road Phase III from Carrier Parkway and SW 3rd St; material testing in the amount of $19,274 with Alliance Geotechnical Group; in-house engineering in amount of $91,465; a 5% contingency in the amount of $91,465, and $10,000 for street lighting provided by Oncor, for a total requested project cost amount of $2,041,485.13

Presenter
Romin Khavari, City Engineer

Recommended Action
Approve

Analysis
Freetown Road Phase III between Carrier Parkway and S.W 3rd Street is proposed to be constructed as a 3-lane 41’- wide concrete thoroughfare; this roadway will replace the existing aged 2-lane asphalt road and will improve traffic flow and provide a smooth riding surface for vehicular traffic. Also included in this roadway improvement is a 6’-wide sidewalk along the south side of the street, drainage and water main improvements.

This project provides for the installation of a 12" water supply line parallel to an existing 12” water main in Freetown Road between Carrier Parkway and SW 3rd Street; this new waterline is part of the City-wide water master plan.

This project consists of approximately 2300 linear feet, 10,000 SY of 3-lane (41’ wide) 9” reinforced concrete pavement, 10,560 SY 6” flex base for sub-grade, 2,170 LF 72”-18” RCP storm drain pipe 2250 LF 12” PVC Water, 1,670 LF 8” PVC Water and other miscellaneous and related items of work.

Please note that the project is to be built in two phases. The roadway is to be closed to traffic due to the construction of the deep 72" and 66" storm drain mains that extend along most of the length of this project. The duplex residents, church, three apartment complexes, convenience store, and day care affected, will have alternate access routes while the project is being constructed. Construction of this project is scheduled to begin in late September 2014 with completion in late May 20...

Click here for full text