Skip to main content
File #: 16-6077    Version: 1 Name: Consultant Contract with Walter P. Moore for Flood Forecasting
Type: Agenda Item Status: Passed
File created: 9/19/2016 In control: Engineering
On agenda: 10/11/2016 Final action: 10/11/2016
Title: Professional Engineering Services Contract with Walter P Moore and University of Texas at Arlington for the development of a Flood Warning-Forecasting System in Grand Prairie in the amount of $100,000
Attachments: 1. 16-6077 Walter P. Moore.pdf
From
Stephanie Griffin

Title
Professional Engineering Services Contract with Walter P Moore and University of Texas at Arlington for the development of a Flood Warning-Forecasting System in Grand Prairie in the amount of $100,000

Presenter
Bill Crolley, Executive Director of Planning, Development and Transportation and Stephanie Griffin, Floodplain Administrator

Recommended Action
Approve

Analysis
The City of Grand Prairie has a rain and stream gauge system consisting of 22 gauges. The system provides real-time rain and stream data. The City’s Stormwater Department, Public Works Streets Department, and Office of Emergency Management use the real-time data to determine locations of flooding and to dispatch crews to blockade these locations during and following storm events. This information is also used in deciding when evacuations are warranted.
The proposed flood warning-forecasting system will use the data collected by the City’s existing rain/stream gauge system to answer the “what if” questions that arise in advance of storm events. “What if it rains __ inches? How high will the creek get?”
The flood warning-forecasting system will be developed in multiple phases with Year 1 being the first phase, including:
· Task 1: Conduct a workshop with emergency management officials, first responders, public works staff and stormwater staff to determine the important aspects of a flood warning system for their activities.
· Task 2: Collect existing rainfall data, stream gauge data, H&H models, radar data, topographic information, historical flood information, GIS information, and other appropriate information to build the system to support the necessary flood warning-forecasting operations.
· Task 3: Develop a flood warning-forecasting system at specific locations with above mentioned data to assist City staff during and following rainfall events by providing timely notifications of locations where life safety is at risk. The engineers will devel...

Click here for full text