File #: 16-6327    Version: 1 Name: Ordinance; Change Order No. 3 East Main Street Drainage
Type: Ordinance Status: Adopted
File created: 12/2/2016 In control: Engineering
On agenda: 12/13/2016 Final action: 12/13/2016
Title: Ordinance amending the FY 2016/2017 Capital Improvement Projects Budget; Change Order No. 3 with Flow-Line Construction, Inc. for East Main Street at the Union Pacific Railroad Bridge Drainage Improvements in the total amount of $61,160
Attachments: 1. 16-6327 E Main.pdf
From
max

Title
Ordinance amending the FY 2016/2017 Capital Improvement Projects Budget; Change Order No. 3 with Flow-Line Construction, Inc. for East Main Street at the Union Pacific Railroad Bridge Drainage Improvements in the total amount of $61,160

Presenter
Ron McCuller, Director of Public Works and Romin Khavari, City Engineer

Recommended Action
Approve

Analysis
On Tuesday, May 3, 2016 the City of Grand Prairie awarded a construction contract to Flow-Line Construction, Inc. in the amount of $1,567,874.00 for drainage improvements to provide drainage for the existing sump in Main Street at the Missouri Pacific railroad bridge overpass.

This proposed change order No. 3 will increase the contract amount of pavement replacement on East Main Street (SH 180) by 556 square yards including traffic marking replacement in the amount of $61,160 in response to a request by TXDOT to replace old cracked pavement on the southerly side of the highway outside but adjoining the contract construction limits. The total change order amount is $61,160 for a revised contract amount of $1,675,638.11.

Change order #1 was approved on September 8, 2016 in the amount of $26,586.11 for traffic warning message boards and additional construction work for a revised contract amount of $1,594,460.11.

Change order #2 was approved on October 11, 2016 in the amount of $20,018.00 for additional construction work for an added storm drain manhole due to a utility conflict for a revised contract amount of $1,614,478.11.

Construction completion of the project is to remain as February 20, 2017.

Financial Consideration
Funds in the amount of $61,160 is available as follows:

1. $31,789 is available in the Storm Drainage Capital Projects Fund (401592) WO #01405603(E. Main Street @ RR Bridge) Contract#184619 contingency

2. $29,371 is available by appropriating and transferring from the unobligated fund balance in the Storm Drainage Capital Projects Fund (401592) to WO #01405603 (E. ...