Skip to main content
File #: 15-5247    Version: 1 Name: Ratification of Construction contract with North Rock Construction for Emergency Repair and Replacement of the failed concrete rainage channel wall at 811 SE 4th St.
Type: Ordinance Status: Adopted
File created: 12/4/2015 In control: Engineering
On agenda: 12/15/2015 Final action: 12/15/2015
Title: Ordinance amending the FY2015/16 Capital Improvement Projects Budget and ratification of a construction contract with North Rock Construction for Emergency Repair and Replacement of the failed concrete drainage channel wall at 811 SE 4th Street (Indian Hill Branch) in the amount of $244,244.56 with 5% contingency of $12,212 for a total request of $256,456.56
Attachments: 1. 15-5247 North Rock.pdf
From
max

Title
Ordinance amending the FY2015/16 Capital Improvement Projects Budget and ratification of a construction contract with North Rock Construction for Emergency Repair and Replacement of the failed concrete drainage channel wall at 811 SE 4th Street (Indian Hill Branch) in the amount of $244,244.56 with 5% contingency of $12,212 for a total request of $256,456.56

Presenter
Stephanie Griffin, Floodplain Administrator

Recommended Action
Approve

Analysis
At approximately 1:00 AM on Friday, November 27, 2015, the channel wall along the southside of the channel at 811 SE 4th Street failed. Approximately 100 feet of concrete wall fell onto the concrete channel floor. Another 30 feet of wall was compromised with this failure. The City was notified of the wall failure on Monday. November 30.
The apartment structure at 811 SE 4th St. is approximately 10 feet from the slope failure and is considered to be in imminent danger should another rain happen before the wall can be fixed. City staff met with its on-call engineer and contractor to discuss potential short-term and permanent solutions. City staff concluded that the permanent solution of replacing the concrete wall would be more cost-effective and timely than attempting short-term solutions.
The entire channel wall along the south side of the channel will be replaced - roughly 200 feet of wall - as an emergency repair and is considered to be a permanent solution.

Financial Consideration
Funding in the total amount of $256,457 is available by approving an ordinance transferring and appropriating from the unobligated fund balance in the Storm Drainage Capital Projects Fund (401592) to WO#01611103 (Emergency Channel Repairs).

Body
AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS, AMENDING THE FY 2015/2016 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $256,457 FROM THE UNOBLIGATED FUND BALANCE IN THE STORM DRAINAGE CAPITAL PROJECTS FUND (401592) WO#01611103 (EMER...