Skip to main content
File #: 12-1952    Version: 1 Name: Final Change Order/Amendment with Jackson Construction for Forum/Crossland
Type: Agenda Item Status: Passed
File created: 8/10/2012 In control: Engineering
On agenda: 8/21/2012 Final action: 8/21/2012
Title: Final Reconciliation Change Order/Amendment No. 5 with Jackson Construction in the negative amount $88,054.04 for Forum/Crossland Construction Project
Attachments: 1. Breakdown, 2. urs letter, 3. Kimley letter
From
max

Title
Final Reconciliation Change Order/Amendment No. 5 with Jackson Construction in the negative amount $88,054.04 for Forum/Crossland Construction Project

Presenter
Romin Khavari, City Engineer and Ron McCuller, Director of Public Works

Recommended Action
Approve

Analysis
On November 16, 2010, the City of Grand Prairie awarded a construction contract to Jackson Construction in the grand total amount of $4,064,520.45 and authorized a 5% contingency of $203,226 for a total of $4,267,746.45 for the Forum/Crossland Road Paving, Drainage, and Water Improvements; and Wastewater Improvements in Robinson Road and Along West Side of SH 161 between Hopi Land and Mayfield Road.

This project, funded by TIF-2, primarily provided for the extension of Forum and Crossland Boulevard to connect to the intersection built as part of the SH 161 Frontage Roads to include the extension of City utilities and any additional related items.

This project provided for the following improvements:
1. Extension of approximately 2,200 LF of Forum Drive (4-lane divided roadway in a 100' ROW) from its intersection with Waterwood Drive to the Forum/Crossland Crossing at SH 161
2. Extension of approximately 1,210 LF of Crossland Boulevard (4-lane divided roadway in a 100' ROW from the Forum/Crossland Crossing at SH 161 to the intersection of Robinson Road and Crossland Boulevard.
3. Installation of approximately 5,500 LF of 12" PVC wastewater line along the west side of Robinson Road, from the connection point at an existing Trinity River Authority (TRA) sanitary sewer line at Robinson Road's crossing with North Fork Fish Creek to extend north to Mayfield Road.
4. Installation of approximately 2,730 LF of 12" PVC sanitary sewer line west of SH 161 between Mayfield Road and Hopi Lane
5. Improvements include storm drainage; street lighting; traffic signalization; a 16" water line along the extension of Forum Drive and Crossland Boulevard; a duct bank system along Crosslan...

Click here for full text