Skip to main content
File #: 16-5530    Version: 1 Name: Engineering and surveying services contract with Halff Associates, Inc. for a 12" Waterline installation along Wildlife Parkway across the Trinity River in the total amount of $54,000
Type: Ordinance Status: Adopted
File created: 3/25/2016 In control: Engineering
On agenda: 4/5/2016 Final action: 4/5/2016
Title: Ordinance amending the FY2015/2016 Capital Improvement Projects Budget; engineering and surveying services contract with Halff Associates, Inc. for a 12" waterline installation along Wildlife Parkway across the Trinity River in the total amount of $54,000
Attachments: 1. 01611803.pdf
From
Anda Upchurch

Title
Ordinance amending the FY2015/2016 Capital Improvement Projects Budget; engineering and surveying services contract with Halff Associates, Inc. for a 12" waterline installation along Wildlife Parkway across the Trinity River in the total amount of $54,000

Presenter
Romin Khavari, City Engineer and Ron McCuller, Director of Public Works

Recommended Action
Approve

Analysis
Dallas County is currently performing the design for the reconstruction of Wildlife Parkway to extend from Belt Line Road West across the Trinity River to connect to the Lower Tarrant Road intersection at SH 161.

As part of this project, the City is responsible for any utility extension design and construction costs. The work will be included as part of the Dallas County project as part of an inter-local agreement.

This project is to provide engineering and surveying services to extend a 12" water main to be installed along the proposed bridge across the Trinity River and to connect to existing water mains on both sides of the river. The sizing of the water main was determined by the City's water master planners.

Design of this project is scheduled to begin in April 2016 and take approximately 6 months to complete.

Financial Consideration
Funding for the engineering and surveying services with Halff Associates, Inc. for a 12" waterline installation along Wildlife Parkway across the Trinity River in the total amount of $54,000 available by appropriating and transferring from the unobligated fund balance of Water Capital Projects Fund (500592) to WO #01611803 (Wildlife Pkwy WTER) 68560 (Eng/Con/Geo).

Body
AN ORDINANCE OF THE CITY OF GRAND PRAIRIE, TEXAS, AMENDING THE FY 2015/2016 CAPITAL IMPROVEMENT PROJECTS BUDGET BY TRANSFERRING AND APPROPRIATING $54,000 FROM THE UNOBLIGATED FUND BALANCE IN THE WATER CAPITAL PROJECTS FUND (500592) WO #01611803 (Wildlife Pkwy WTER)

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAND PRAIRIE, TEXAS...

Click here for full text