Skip to main content
File #: 19-9049    Version: 1 Name: Construction contract with SYB Construction Company, Inc. for Drainage Improvements 1800 2200 North Carrier Parkway in the total amount of $898,656.84; material testing with Alliance Geotechnical Group in the amount of $24,659.63; in house engi
Type: Agenda Item Status: Consent Agenda
File created: 6/7/2019 In control: Engineering
On agenda: 6/18/2019 Final action: 6/18/2019
Title: Construction contract with SYB Construction Company, Inc. for Drainage Improvements 1800-2200 North Carrier Parkway in the total amount of $898,656.84; material testing with Alliance Geotechnical Group in the amount of $24,659.63; in-house engineering in the amount of $44,932.84; and 5% construction contract contingency in the amount of $44,932.84; for a total project cost of $1,013,182.15
Attachments: 1. Letter of Recommendation- SYB_Construction_06_07_19b.pdf, 2. 619.pdf, 3. 619.pdf
From
max

Title
Construction contract with SYB Construction Company, Inc. for Drainage Improvements 1800-2200 North Carrier Parkway in the total amount of $898,656.84; material testing with Alliance Geotechnical Group in the amount of $24,659.63; in-house engineering in the amount of $44,932.84; and 5% construction contract contingency in the amount of $44,932.84; for a total project cost of $1,013,182.15

Presenter
Romin Khavari, City Engineer and Gabe Johnson, Director of Public Works

Recommended Action
Approve

Analysis
This project was identified as part of the FY19 Capital Improvement Projects Budget. The Drainage Improvements 1800-2200 North Carrier Parkway project addresses flooding problems on this section of North Carrier Parkway by providing a 10-year capacity storm drainage system in advance of the upcoming Carrier Parkway paving rehabilitation improvements.

This project replaces the existing undersized 48 inch and 42 inch diameter reinforced concrete pipe storm drains with 5 foot by 4 foot and 8 foot by 5 foot reinforced concrete box storm drains and replaces the existing 18 inch and 24 inch storm drains in Carrier Parkway with 24 inch reinforced concrete pipe to 5 foot by 3 foot reinforced concrete box storm drains with junction box structures and concrete interception channel with 16 inlets. Four bids were received for this project:

The City of Grand Prairie advertised and on May 19, 2019 received four (4) bids for Drainage Improvements 1800-2200 North Carrier Parkway, WO #01905603. The bids were checked for errors and omissions and no errors were found.
Company Total Bid
SYB Construction Company, Inc. $898,656.84
McMahon Contracting, LP $936,218.38
North Texas Contracting, Inc. $949,029.00
Jackson Construction, Ltd. $1,156,106.00

Based on Consultant recommendation, Staff also recommends that this project be awarded to SYB Construction Company, Inc in the amount of $898,656.84.

Cons...

Click here for full text