Professional Engineering Service contract with Freese and Nichols, Inc. for the design, bidding, and construction administration of Dorchester Levee Pump Replacement and Related Improvements in the amount of $213,566 with a 5% contingency of $10,678.30 for a total project request of $224,244.30
Presenter
Gabriel Johnson, Director of Public Works and Stephanie Griffin, Floodplain Administrator
Recommended Action
Approve
Analysis
The pumps at the Dorchester Levee are the original pumps that were installed in the early 1990s. The pumps have reached the end of their useful life. Electrical and SCADA system upgrades are also needed. The pump and pond operations should be updated to optimize their efficiency.
Freese and Nichols, Ins. (FNI) has been selected to provide these services. FNI will determine the electrical upgrades required for the replacement pumps, analyze the pump and pond operations to improve the pump capacity as part of the pump replacement while maintaining the existing pipe system and will size the pumps and related equipment. FNI will determine the appropriate size generator that is needed to operate the facility. (The purchase and installation of a generator will be a separate project at some point in the future.) The SCADA system will be expanded to include the operations of the sluice gates. FNI will also provide bidding and construction administration services as part of this contract by preparing the bid book, assist with the bid opening, and provide limited construction administration such as responding to RFI's.
Financial Consideration
Funding for the Dorchester Levee pump system upgrades in the total amount of $224,245, is available in the Water Capital Projects Fund (500592) WO #01810903 (Dorchester Levee Pumps and motor controls)