Skip to main content
File #: 17-7356    Version: 1 Name: Professional Contract with Halff Associates for IH 20 Right Turn Lane at Lake Ridge Parkway
Type: Agenda Item Status: Consent Agenda
File created: 11/7/2017 In control: Engineering
On agenda: 11/21/2017 Final action: 11/21/2017
Title: Professional Services Contract with Halff Associates, Inc. for the engineering design and construction services for the addition of a right turn lane from eastbound IH-20 frontage road to southbound Lake Ridge Parkway in the amount of $87,310
Attachments: 1. 617.pdf

From

Sholeh Karimi

 

Title

Professional Services Contract with Halff Associates, Inc. for the engineering design and construction services for the addition of a right turn lane from eastbound IH-20 frontage road to southbound Lake Ridge Parkway in the amount of $87,310

 

Presenter

Walter Shumac, Director of Transportation

 

Recommended Action

Approve

 

Analysis

This project involves preparing construction plans for the addition of a right turn lane from eastbound IH20 frontage road to southbound Lake Ridge Parkway.  The proposed right turn lane is located within TxDOT right-of-way requiring TXDOT permit to allow City construction to occur.

 

City of Grand Prairie Administrative Directive 10.0, and Section 2254.004 of the Government Code states the procurement of architectural or engineering services by the City requires the City first select the most highly qualified provider of the services, and then, negotiate a contract at fair price and reasonable price.  Halff Associates, Inc has done many TxDOT projects and is considered one of the most qualified engineering firms in regards to roadway design and adherence to specific TxDOT requirements. For these reasons, City Staff recommends approval of this contract.

 

Financial Consideration

Funding in the amount of $87,310 is available in Street Capital Projects Fund (400192) WO #01713401 (IH20 Slip Ramp)