Skip to main content
File #: 18-7779    Version: 1 Name: Ratification of an emergency purchase with North Texas Contracting, Inc for the repair of a water main break on Collins St.
Type: Agenda Item Status: Consent Agenda
File created: 4/2/2018 In control: Public Works
On agenda: 4/17/2018 Final action: 4/17/2018
Title: Ratification of an emergency purchase with North Texas Contracting, Inc for the repair of a water main break on Collins St (in front of the Grand Prairie Municipal Court and Grand Prairie Housing and Neighboring Services buildings) in the amount of $203,759, plus a 5% contingency of $10,187.95, for a total of $213,946.95
Attachments: 1. GP Collins Waterline ROM Pricing.pdf, 2. 18-7779 - Expenditure Form.pdf

From

Marysol Alagenchev

 

Title

Ratification of an emergency purchase with North Texas Contracting, Inc for the repair of a water main break on Collins St (in front of the Grand Prairie Municipal Court and Grand Prairie Housing and Neighboring Services buildings) in the amount of $203,759, plus a 5% contingency of $10,187.95, for a total of $213,946.95

 

Presenter

Gabriel Johnson, Director of Public Works

 

Recommended Action

Approve

 

Analysis

On March 23, 2018, we experienced a water break on the 6" water line on Collins St (in front of the Grand Prairie Municipal Court and Grand Prairie Housing and Neighboring Services buildings). The water break was caused from deterioration of the line. This pipe is a type that requires a special repair process, which we do not have the in-house capability to perform.

 

Since lack of this connection impairs water and fire flow for the entire north part of the City, it was imperative that we restored the connection as soon as possible.

 

Local government code 252 allows for an exemption from the bid process for procurement necessary because of unforeseen damage to public machinery, equipment, or other property.  Due to the critical nature of this emergency, we requested and were approved to waive the normal bidding procedures and awarded contract to North Texas Contracting, Inc. in the amount of $213,946.95.

 

Financial Consideration

Funding for the emergency purchase with North Texas Contracting, Inc for the repair of a water main break on Collins St in the amount of $213,947 is available in the FY 2017/2018 Water WasteWater Operating Fund (361211) Water Mains Maintenance (63095) and will be charged accordingly.