File #: 18-8080    Version: 1 Name: Ordinance; Construction Contract with RKM Utility Services, Inc. for Paving, Drainage, Water and Wastewater Improvements to Acosta Street from Nunez to Cober
Type: Ordinance Status: Adopted
File created: 7/24/2018 In control: Engineering
On agenda: 8/7/2018 Final action: 8/7/2018
Title: Ordinance amending the FY 2017/2018 Capital Improvement Projects Budget; Construction contract with RKM Utility Services, Inc. for Paving, Drainage, Water and Wastewater Improvements to Acosta Street from Nunez to Cober, in the total amount of $1,293,459; material testing with Reed Engineering Group in the amount of $19,802.75; in-house engineering in the amount of $64,672.95; and 5% construction contract contingency in the amount of $64,672.95; for a total project cost of $1,442,607.65
Attachments: 1. 18-8080 Acosta 618.120 WTER.pdf, 2. 18-8080 Acosta 618.131 WWST.pdf, 3. 18-8080 Acosta 617.78 STRT, 4. 18-8080 Acosta 618.57 STRM
From
max

Title
Ordinance amending the FY 2017/2018 Capital Improvement Projects Budget; Construction contract with RKM Utility Services, Inc. for Paving, Drainage, Water and Wastewater Improvements to Acosta Street from Nunez to Cober, in the total amount of $1,293,459; material testing with Reed Engineering Group in the amount of $19,802.75; in-house engineering in the amount of $64,672.95; and 5% construction contract contingency in the amount of $64,672.95; for a total project cost of $1,442,607.65

Presenter
Romin Khavari, City Engineer and Gabriel Johnson, Director of Public Works

Recommended Action
Approve

Analysis
On Tuesday, July 17, 2018 the City of Grand Prairie opened bids for Paving, Drainage, Water and Wastewater Improvements Acosta Street from Nunez to Cober. The low bidder is RKM Utility Services, Inc. in the Base Bid amount of $1,293,459.00 for total bid amount of $1,293,459.00.

This project was identified as part of the FY17 Capital Projects Budget and Capital Projects Plan for proposed paving, drainage, water and wastewater projects. Paving, Drainage, Water and Wastewater Improvements Acosta Street from Nunez to Cober provides for standard 27 foot wide reinforced concrete paving and underground storm drainage improvements to replace the existing 2 lane asphalt street and existing open roadside ditch drainage. This project also provides reinforced concrete sidewalks adjoining the street and replaces old water and wastewater mains within the limits of the project.

This project provides approximately 333 cubic yards of compacted fill, 4515 cubic yards of unclassified excavation, 228 square yards of reinforced concrete pavement removal, 4333 square yards of 10-inch thick reinforced concrete paving on compacted 8-inch thick flex base subgrade, 563 square yards of 6-inch thick reinforced concrete driveway and alley pavement, 1033 square yards of 4-inch thick reinforced concrete sidewalk, 1200 linear feet of street lighting improvements,...