File #: 14-3810    Version: 1 Name: Avenue H Flow Vault
Type: Agenda Item Status: Consent Agenda
File created: 6/26/2014 In control: Public Works
On agenda: 7/15/2014 Final action: 7/15/2014
Title: Service contract with Dake Construction Company for Avenue H Flow Vault, Installation of Water Valve with Actuator, in the amount of $222,000, and authorize a staff controlled 5% contingency fund of $11,100, for a total amount of $233,100
Attachments: 1. 14-3810 FIS Ave H Flow Vault, 2. 14-3810 Ave H Flow Vault
From
Donna Villafranca
 
Title
Service contract with Dake Construction Company for Avenue H Flow Vault, Installation of Water Valve with Actuator, in the amount of $222,000, and authorize a staff controlled 5% contingency fund of $11,100, for a total amount of $233,100
Presenter
Ron McCuller, Public Works Director
 
Recommended Action
Approve
 
Analysis
This contract is for the supply and installation of a new 30 inch butterfly water valve with actuator to include concrete vault, sump pump, electrical, SCADA with tie-in to include all materials and labor, complete in place, at Avenue H and Duncan Perry.   
 
Engineering and surveying services, preliminary and final design, for the Avenue H Flow Vault Improvement, was completed by The Wallace Group, WO #01207303 (24" Transfer valve N. I-30 17N).  Bids for the flow vault improvement (#14103) were opened on May 20, 2014. There were 28 vendors notified, two responded - there were not any Grand Prairie vendors.  Dake Construction the apparent low bidder, for a total amount of $222,000, meets specifications and is acceptable. A contingency amount of 5% is added to the award, making the total $233,100.  Total construction cost includes an allowance of $49,876 for the City of Grand Prairie's SCADA service provider to perform the controls for the project.  
 
Dake Construction - $222,000
Fryer Construction - $225,565
 
Financial Consideration
Funding for the award of a Construction Contract to Dake Construction, in the amount of $222,000 plus a staff controlled 5% contingency of $11,100 for a total amount of $233,100 for the Avenue H Flow Vault Improvement, is available in the Water Capital Projects Fund (500592) WO #01207303 (24" Transfer valve N. I-30 17N).