File #: 17-6911    Version: 1 Name: Construction contract with Excel 4 Construction LLC for the W.E. Roberts St. Water and Wastewater Improvements Project
Type: Agenda Item Status: Consent Agenda
File created: 7/7/2017 In control: Engineering
On agenda: 7/18/2017 Final action: 7/18/2017
Title: Construction contract with Excel 4 Construction LLC in the amount of $375,319.00 for the W.E. Roberts St. Water and Wastewater Improvements project; material testing with Alliance Geotechnical Group in the amount of $12,423; 5% contract contingency in the amount of $18,766; in-house labor distribution in the amount of $18,766, for a total project cost of $425,274
Attachments: 1. Letter of Recommendation - W.E. Roberts.pdf, 2. 17-6911 WE Roberts.pdf
From
Maxine Snow

Title
Construction contract with Excel 4 Construction LLC in the amount of $375,319.00 for the W.E. Roberts St. Water and Wastewater Improvements project; material testing with Alliance Geotechnical Group in the amount of $12,423; 5% contract contingency in the amount of $18,766; in-house labor distribution in the amount of $18,766, for a total project cost of $425,274

Presenter
Romin Khavari, City Engineer and Ron McCuller, Director of Public Works.

Recommended Action
Approve

Analysis
As part of the City’s ongoing Capital Improvements Program, aging, high maintenance wastewater and water lines are recommended for replacement by the Water Utilities staff on a yearly basis. City staff has prepared plans and specifications to replace aged wastewater and water mains located adjacent to each other behind the property addressed at 2515 W. Jefferson St. These lines run perpendicular behind this property connecting to existing lines on Jefferson and W.E. Roberts The wastewater main includes approximately 1,054 linear feet of 8” wastewater pipe replacement, 5 new wastewater manholes, approximately 385 square yards of pavement replacement, approximately 1,300 square yards of sod replacement, and approximately 600 linear feet of 8’ chain link security fencing replacement. The water main includes approximately 770 linear feet of 8” water pipe replacement, a temporary 2” water main in order to maintain water service during construction, and approximately 275 square yards of sod replacement.

The City of Grand Prairie advertised and received four (4) proposals for this project on Tuesday, June 6, 2017. Below is a summary of qualified proposals and their respective proposed contract amounts:

Excel 4 Construction LLC Total Bid: $375,319.00*
KIK Underground LLC Total Bid: $481,501.00
SYB Construction Co., Inc. Total Bid: $576,470.00
Reytech Services LLC Total Bid: $697,125.50

*recommended for award

This project was bid using...