From
Max
Title
Change Order No. 3 with Tri-Tech Construction Inc. in the negative amount of ($109,547) for Storm Drain Installation, Water and Wastewater Replacements for Sandra Lane
Presenter
Romin Khavari, City Engineer
Recommend Action
Approve
Analysis
On June 1, 2010, Council approved a construction contract with Tri-Tech Construction Inc. in the amount of $1,061,162.20.
This project provided for the installation of approximately 2,130 linear feet of storm drain main; approximately 2,040 linear feet of water main, 1,965 linear feet of wastewater main, and 4,875 square yards of asphalt pavement replacement as well as various items related to the installation of storm drain, water, wastewater and pavement installation along Sandra Lane.
Change Order No. 1 provided for plan sheet modifications only. No additional funding and days were required.
Change Order No. 2 in the amount of $37,066 provided for pavement repairs along Prairie Lane from Alspaugh Lane to Nadine Lane. These pavement repairs were needed due to the deteriorated condition of the existing pavement from Alspaugh to Nadine Lane, made worse due to the construction traffic for the installation of the sanitary sewer line. The pavement repairs included the reclamation of the existing asphalt pavement and mixing it with cement to reuse as a base material. After the reclaimed base material was placed, a surface treatment of 2ā of Type āDā hot mix asphaltic concrete pavement was placed on top of the reclaimed base completing the repairs. 45 additional calendar days of construction was added to complete the proposed work. The original completion date of the contract was February 22, 2011. The revised completion date was changed to April 8, 2011.
The current proposed Change Order No. 3 provides for a revision in the construction method and materials for the removal and replacement of the existing pavement along Sandra Lane distrubed due to the storm drain and utility installations. The...