File #: 12-2158    Version: 1 Name: Professional design services contract with Fratto Engineering, Inc. (FEI) in the amount of $24,450.00, a 5% contingency in the amount of $1,222.50, and a not to exceed $4,500.00 reimbursables allowance for a total of $30,172.50 for completion of final des
Type: Resolution Status: Adopted
File created: In control: Engineering
On agenda: 10/16/2012 Final action: 10/16/2012
Title: Resolution declaring expectation to reimburse expenditures with proceeds of future debt in the amount of $37,672.50 for a professional design services contract with Fratto Engineering, Inc. (FEI) in the amount of $24,450, a 5% contingency in the amount of $1,222.50, and a not to exceed $4,500 reimbursables allowance for a total of $30,172.50, for completion of final design and construction administration services for a new Spay and Neuter Surgical Suite at the Prairie Paws Adoption Center; and $7,500 to cover subsurface geotechnical investigation, TAS H/C plan and site reviews, and other necessary related costs for a total request of $37,672.50.
Attachments: 1. Fiscal Impact Statement 612.32.pdf
From
max

Title
Resolution declaring expectation to reimburse expenditures with proceeds of future debt in the amount of $37,672.50 for a professional design services contract with Fratto Engineering, Inc. (FEI) in the amount of $24,450, a 5% contingency in the amount of $1,222.50, and a not to exceed $4,500 reimbursables allowance for a total of $30,172.50, for completion of final design and construction administration services for a new Spay and Neuter Surgical Suite at the Prairie Paws Adoption Center; and $7,500 to cover subsurface geotechnical investigation, TAS H/C plan and site reviews, and other necessary related costs for a total request of $37,672.50.

Presenter
Marshall Warder, Building Projects Manager

Recommended Action
approve

Analysis
A surgical suite for spaying and neutering of adoptable dogs and cats housed at the PPAC has been under consideration by Environmental Services for more than a year. If constructed, it is anticipated that the surgical suite would be built through renovation of the most remote drive through truck bay at the east end of the existing facility that currently receives minimal usage other than miscellaneous bulk storage.

In October 2011, with initial design funding approved and available, Environmental Services contracted with FEI in the amount of $16,250.00 plus a not to exceed $2,500 reimbursables cost to provide professional design services and an estimate of construction cost through the Design Development phase only for the contemplated facility. It was reasoned that a design contract through this preliminary phase in conjunction with the accompanying estimate of construction would allow a good look at the proposed project by Council, who could then make a prudent decision on the merits of moving forward with the project or not without committing to the full design cost or any construction cost.

FEI worked with City staff to prepare plans as contracted, and an independent professional estimate of constru...